5.2. Information for Commissioning Inverter
After you have successfully powered up the inverter, the inverter must be programmed and set up as per
the programming feature above.
Check the each bond on
the solar panels
Check the VOC does not
exceed 480V
Ensure both MPPTs are
balanced
Measure
the
supply
voltage check it matches
the settings of the inverter
If it falls our of the setting
range it will cause the
inverse shut down and
alarm
See Grid set up page
Check the battery charge
and discharge is within
the C rating of the battery.
Too high will damage the
battery
Check the battery BMS is
communicating with the
inverter
This is the heart of the
system
this
controller
everything
Ensure you are familiar
with this, if you fully
understand the controller
you will fully appreciate
the capabilities of there
inverter
See section 4.14
This is for paralleling
systems, and wind turbine
If paralleling inverters in 3
Phase check you phase
rotation before switching
on the AC Load, in 3
Phase the output voltage
will increase across phase
to 400V
If using a wind turbine
please ensure you have
the
correct
limiting
resistor, caps and rectifier
Familiar your self with