3.  INSTALLATION 

 

3.1. Selecting the Mounting Area 

 

 

 

DO NOT install the inverter in the following areas: 

 

Areas with high salt content, such as the marine environment. It will deteriorate metal parts, causing 
the parts to fail or the unit to leak water. 

 

Areas filled with mineral oil or containing a large amount of splashed oil or steam, such as a kitchen. 
It will deteriorate plastic parts, causing the parts to fail or the unit to leak water. 

 

Areas that generates substances that adversely affect the equipment, such as sulfuric gas, chlorine 
gas,  acid,  or  alkali.  It  will  cause  the  copper  pipes  and  brazed  joints  to  corrode,  which  can  cause 
refrigerant leakage. 

 

Areas that can cause combustible gas to leak, which contains suspended carbon-fiber or flammable 
dust, or volatile inflammable such as paint thinner or gasoline. 

 

Areas where there may be gas leaks and settles around the unit. It can cause fires.  

 

Areas where animals may urinate on the unit or ammonia may be generated. 

 

High altitude areas above 4000 meters above sea level. 

 

Environments where precipitation or humidity are above 95% 

 

Areas where the air circulation is too low.  

ALSO CONSIDER: 

Содержание 3.6K-SG02LP1

Страница 1: ...P1 SUNSYNK 5K SG03LP1 SUNSYNK 8K SG02LP1 SUNSYNK 7 6K SG02LP1 SUNSYNK 6K SG02LP1 SUNSYNK 5K SG02LP1 SUNSYNK 3 6K SG02LP1 Global Tech China Ltd 3 Floor Wai Yip Industrial Building 171 Wai Yip Street Kw...

Страница 2: ...onitoring If an Earth Fault Alarm occurs the fault code F24 will be displayed on the inverter screen the LED indicator fault will light up All these models fall into two cabinet PCB types 5 5kW Small...

Страница 3: ...E 24 4 4 STATUS PAGE 25 4 5 SYSTEM FLOW PAGE 26 4 6 SETUP PAGE 27 4 7 SET TIME CLOCK 27 4 8 SET COMPANY NAME BEEPER AUTO DIM 28 4 9 FACTORY RESET AND LOCK CODE 29 4 10 BATTERY SETUP HOME PAGE 29 4 11...

Страница 4: ...IONING 52 5 1 STARTUP SHUTDOWN PROCEDURE 52 5 2 INFORMATION FOR COMMISSIONING INVERTER 53 5 3 GFDI FAULT 54 6 MAINTENANCE OF THE SYSTEM 54 APPENDIX A 55 APPENDIX B 56 APPENDIX C 56 APPENDIX D 56 APPEN...

Страница 5: ...ctly grounded and the supply line must be equipped with a suitable breaker and RCD to protect people The unit is not explosion proof so it should not be installed in an explosive atmosphere Never touc...

Страница 6: ...unction grid tied and off grid COMPATIBLE Compatible with main electrical grid voltages or power generators Compatible with wind turbines 220V single phase pure sinewave inverter Self consumption and...

Страница 7: ...hort circuit protection Smart battery charger design for optimized battery protection Limiting function installed to prevent excess power overflow to grid APPLICATIONS Marine vessel power management P...

Страница 8: ...grid 2 times of rated power 10 S AC Output Rated Current A 15 7A 21 7A Max AC Output Current A 18A 25A Max Continuous AC Passthrough A 35A Power Factor 0 8 leading to 0 8 lagging Output Frequency and...

Страница 9: ...rt up Voltage V 150V PV Input Current A 11A 11A 18A 9A 18A 18A 18A 18A No of MPPT Trackers 2 No of Strings Per MPPT Tracker 1 1 2 1 2 2 2 2 AC Output Data Rated AC Output and UPS Power W 5000W 6000W 7...

Страница 10: ...7 G98 G99 IEC61683 IEC62116 IEC61727 Safety Regulation IEC62109 1 IEC62109 2 EMC EN61000 6 1 EN61000 6 3 FCC 15 Class B General Data Operating Temperature Range 25 60 C 45 C Derating Cooling Fan Noise...

Страница 11: ...eas that generates substances that adversely affect the equipment such as sulfuric gas chlorine gas acid or alkali It will cause the copper pipes and brazed joints to corrode which can cause refrigera...

Страница 12: ...ive measures so that they cannot reach and touch the unit Install the indoor unit on the wall where the height from the floors is higher than 1600mm 3 2 Mounting the Inverter Select installation locat...

Страница 13: ...r It is recommended to utilize a suitable fuse and DC isolator see next page In some applications switching devices may not be required but overcurrent protectors are still required A minimum battery...

Страница 14: ...tting it up in the inverter 1 Connect a properly power cable following the battery manufacturer specification and recommend safety devices 2 Connect communication cable properly following the battery...

Страница 15: ...tech china com 15 3 3 2 Battery Temperature Connection Without a remote temperature sensor lead acid batteries may undercharge or overcharge depending on the ambient temperature of the installation en...

Страница 16: ...ies BMS Therefore you need to set the protocol of the BMS on both the battery and the inverter WHEN USING MORE THAN ONE BATTERY THE FIRST BATTERY WILL BE THE MASTER AND THE OTHER BATTERIES WILL BE THE...

Страница 17: ...ions be sure to open DC protector or disconnector first 2 Remove insulation sleeve 10mm length unscrew the bolts insert the AC input wires according to polarities indicated on the terminal block and t...

Страница 18: ...coil is one of the most important parts of the Sunsynk Parity inverter This device reduces the power of the inverter to prevent feeding power to the grid This feature is also known as Zero Export Fit...

Страница 19: ...conductor fails All neutrals can be linked together to maintain the neutral bond When Neural Earth bond is required for off grid then it has to be removed on grid tied operation IMPORTANT If the CT co...

Страница 20: ...this Sunsynk provides an AC output which is connected to the A T S connections whenever the inverter is running on Island Mode Therefore you can simply connect the coil of an AC relay to the ATS 240...

Страница 21: ...he maximum current of the array connected to each MPPT is 18Amp Before connecting to PV modules install a separate DC circuit breaker between the inverter and PV modules To avoid any malfunction do no...

Страница 22: ...te DC circuit breaker between the inverter and PV modules To avoid any malfunction do not connect any PV modules with possible current leakage to the inverter For example grounded PV modules will caus...

Страница 23: ...l AC Green LED solid light Grid connection normal Normal Green LED solid light Inverter functioning normally Alarm Red LED solid light Fault Function Key Description Esc To exit the previous mode Up I...

Страница 24: ...e to access the home page Daily readings Real time readings What this page displays Total daily power into the battery kWh Total daily power out of the battery kWh SOC State of charge of the battery T...

Страница 25: ...iving from the grid the power is positive If the sign of the grid and HM powers are not the same when the PV is disconnected and the inverter is only taking energy from the grid and using the HM CT co...

Страница 26: ...at the figure bellow 1 The PV modules charge the batteries 2 When the batteries reach a specific level programmable the battery power is fed into the inverter 3 The inverter can then supply power to t...

Страница 27: ...i BMS press Li BMS 4 7 Set Time Clock To set time click on the Basic icon and then on Time How to set up step by step 1 Touch the screen on the variable that you want to change 2 Change the number up...

Страница 28: ...own and then select ok This will change the name on the home screen How set the auto dim Set a number in the auto dim box to dim the LEO after a number of seconds How to activate deactivate the beep M...

Страница 29: ...the Battery icon and then on Batt type What you can do from this page Use battery voltage for all settings V Use battery SOC for all settings What this page displays Reset status Whether lock code is...

Страница 30: ...rid Charge signal to auto switch a relay box IMPORTANT TO PROTECT YOUR BATTERY AND INVERTER 200Ah AGM battery max charge discharge current 40Amps 400Ah AGM battery max charge discharge current 80Amps...

Страница 31: ...ux input cannot be paralleled Also the inverter will extract what it needs from the grid supply to charge its batteries If you connect the generator to the Gen in part when there is a Gen signal the i...

Страница 32: ...utdown is below 19V What this page displays Inverter shut down the voltage as a voltage or Inverter low battery warning voltage or Restart voltage as a voltage or What you can do from this page Adjust...

Страница 33: ...nd held constant while the current is reduced to less than 1 of battery capacity This mode can be used to maintain a fully charged battery indefinitely Equalisation This is essentially a controlled ov...

Страница 34: ...me battery manufacturers use others It is important to always refer to the documentation of the battery manufacturers when installing the battery Below there is a list of batteries that has been exami...

Страница 35: ...0 Topakpower 48Vxxxx RS485 4 Hai Ying HY48050 CAN 0 Re Power LS4850 CAN 0 IMPORTANT When not using communications between battery and inverter never overcharge your battery bank concerning current an...

Страница 36: ...ce the inverter to always take this amount of power from the grid to minimise nuisance Reverse Power Detection tripping of sensitive prepaid electricity meters 5 This controls the maximum overall powe...

Страница 37: ...ct battery charging settings on the battery charge page as shown in Section 4 10 Battery Setup Home Page If Use Time is enabled then the inverter will use battery power according to your settings when...

Страница 38: ...ommands from grid company and then adjust inverter output power The power output or input will vary in response to the AC grid voltage This function is switched off by default 1 Click Q V for Volt Var...

Страница 39: ...Website www sunsynk com E mail sales globaltech china com 39 Voltage Trip and Ride Through L HVRT Frequency Trip and Ride Through L HFRT...

Страница 40: ...leling Inverters To configure multi inverter settings click on the Advance icon What this page displays If the inverter operates as a master or a slave Modbus Device ID which must be unique for each i...

Страница 41: ...with fuse isolators to each inverter Each invert will require a fuse isolator with surge protection and each group circuit will require an RCD If the batteries as supplying power to the main load duri...

Страница 42: ...rs What is the sequence to install connect commission First of all leave the main supplies off Next connect all communication cables set up all LCDs and then finally turn on the main supplies What are...

Страница 43: ...uences of setting A B or C phase wrong on the LCD It can damage the inverter Recommend checking the phase rotation with a meter before switching on What are the consequences of factory resetting power...

Страница 44: ...or consumed Access this page by clicking on the Solar Turbine icon on the home page 4 19 Advanced Settings for Wind Turbine To configure wind turbine settings click on the Advance icon What this page...

Страница 45: ...e solar module is still generating power a dump load will provide the electricity a path to flow This can be done using a switch on by the smart load option or utilizing a wind turbine controller with...

Страница 46: ...or Voltage Battery level when the Aux load switches on Solar Power Power limiter to the maximum power allowed to the Aux load Gen Input Tick this box if using a Generator Aux Load Output Tick this bo...

Страница 47: ...ak Shaving It is a technique used to reduce electrical power consumption during periods of maximum demand on the utility grid Thus one can save substantial amounts of money due to peaking charges What...

Страница 48: ...he problem description including the fault code and indicator status displayed on the LCD is as detailed as possible 5 Your contact information Error Code Description Solutions F13 Working Mode Change...

Страница 49: ...ge fault 1 Check if the voltage is in the range of standard voltage in specification this can be adjusted via the grid set up page 2 Check if grid cables are correctly connected F47 AC over frequency...

Страница 50: ...erVolt_Fault F12 AC_SlaveContactor_Failure F44 AC_VW_UnderVolt_Fault F13 Working_Mode_change F45 AC_UV_OverVolt_Fault F14 DC_OverCurr_Failure F46 AC_UV_UnderVolt_Fault F15 AC_OverCurr_Failure F47 AC_O...

Страница 51: ...unsynk com NOTE The energy storage inverter is designed according to the grid connected operation The inverters meets the safety and electromagnetic compatibility requirements as established in the ma...

Страница 52: ...neer has completed the Earth Bond RCD and Earth Leakage Tests check the solar panel Voc voltage Must not exceed 480V and check the battery voltage Then the inverter can now be switched on Power on Seq...

Страница 53: ...eck the battery charge and discharge is within the C rating of the battery Too high will damage the battery Check the battery BMS is communicating with the inverter This is the heart of the system thi...

Страница 54: ...ill not connect to the grid and will report an error F24 on its LCD 6 Maintenance of the System The inverter is low maintenance however it is important that at least twice a year for dusty environment...

Страница 55: ...Website www sunsynk com E mail sales globaltech china com 55 Appendix A...

Страница 56: ...ation requirements of AS NZS3000 for the cable from the switchboard to the IES If an RCD is used the RCD shall 1 disconnect all live conductors including the actives and neutral and 2 be of the type s...

Страница 57: ...Pty Ltd 166a King William Road HYDE PARK SA 5061 61 0 429 075 444 Website http www sunsynk com Contact leigh_horton pm me Manufacturer Sunsynk Limited Part of Global Tech 171 Wai Yip Street Kwun Tong...