4 Installation Guide
User Manual
22
Fig. 4-5
Diagram of cabling route
4.3.5 Output wiring and connections
Step 1
Lift the protective cover upwards. Then loosen the nut from water-proof
terminals.
Step 2
Insert the “DC+” cable through “DC Output (+)” terminal. Enough cable
bending space should be ensured.
Step 3
Strip off both protective and insulating layers with the help of a hand
crimping pliers. The length of cable conductor shall be approx. 35mm.
Step 4
Connect cable conductor to certain DT terminal.
For PVS-8M, 50mm
2
terminal.
For PVS-12M, 70mm
2
terminal.
For PVS-16M, 90mm
2
terminal.
Step 5
Insert the DT terminal, and tighten the nut by using an inner hexagon
spanner. Firm cable onto the cable support bar. Appropriate cable bending
space shall be ensured.
Содержание SunBox PVS-8M
Страница 1: ...SunBox PVS 8M PVS 16M PV Array Combiner Box User Manual...
Страница 2: ......
Страница 46: ...8 Appendix User Manual 42...