10 Appendix I: LCD Operation
Refer to
for button operations when setting parameters.
10.1
Main Screen
After successful commissioning, the LCD screen will enter the main screen.
6
5000
Running
=
~
3000
100
1900
16:37
(W)
+
-
1
2
3
4
5
C
No.
Description
1
Current PV input power
2
Current export power
3
Warning information
4
Total load consumption
5
Battery charge/discharge
power
6
System status bar
C
: The inverter and the iSolarCloud server are successfully connected.
Running
: The inverter is in its normal running state.
16:37
: Current system time.
Neither the grid power nor the load power will be displayed on the main screen
in case of no SUNGROW meter installed.
If there is no button operation for:
1 minute, the LCD backlight is OFF;
2 minutes, system returns to the default menu (main screen).
Tab. 10-1
State Descriptions
State
Description
Running
After being energized, the inverter tracks the PV strings’
maximum power point (MPP) and runs with the combination of
the energy management system. This mode is the normal
mode.
Maintain
The system is running normally, with the battery in
maintenance process. (Only for lead-acid battery)
Forced
The system is running normally, with the EMS in forced mode.
Ext. EMS
The system is running normally and is controlled by external
EMS.