User Manual
54
3.
Remove the cable jacket
and strip the wire insulation.
5 mm
–
7 mm
40 mm
–
50 mm
4.
Plug the wires into
BAT_Temp.
terminal
without tool tightening.
Note:
For reconnection, press the
part as shown in the red
circle so as to pull out the
cable.
PT1000
BAT_Temp.
5.
Fasten the swivel nut with a torque of 1 N
m–2 N
m and place the
temperature sensor next to the lead-acid battery.
6.9 STB5K-20 Connection (EPS)
The backup box is installed between the SUNGROW meter and the hybrid
inverter SH5K-20. If the backup box is installed, you should enable the EPS
function and set the reserved capacity for Li-ion batteries via the LCD. For
details, see “
10.4.2 Setting the EPS Function
”.
Sungrow meter
Home
appliance
PV system
STB5K-20
Emergency
appliance
SH5K-20
A
Meter
link
Network
meter
Main
switch
Utility
grid
Battery