22
•
Anything, which may hinder the transport, like trees, cables (or similar), should be
removed.
•
Transport the MV Station on fine weather days as far as reasonably possible.
•
Warning signs or barriers must be posted near the transport areas to avoid
accidental injuries.
Additionally, the following should be met when the MV Station is placed on the ground:
•
Place the MV Station carefully and gently. Do not pull or push the MV Station on any
surface.
•
The place should be firm and flat, has good drainage and has no obstacles or
outshoots. The MV Station should be placed and supported by the four feet.
5.2
Hoisting the MV Station
5.2.1 Safety Precautions
•
Observe the safety operating rules of the crane at all times.
•
Standing within 5 to 10 meters of the hoisting areas is strictly forbidden!
Anybody standing under the boom or MV Station is strictly forbidden in the
whole hoisting process.
•
The hoisting work must be stopped in violent weather days. For example, in
strong wind, heavy rain, or thick fog conditions.
Carefully observe the following items:
•
All safety requirements must be met.
•
A professional instructor is needed in the whole hoisting process.
•
The crane should have sufficient arm length and radius of gyration.
•
All the connection point must be firmly connected.
•
The length of the slings can be adjusted appropriately according to on-site
conditions.
•
Transport the MV Station in a level, smooth and steady way.
•
Transport the MV Station by connecting the four top corner fittings.
•
Some accessories may be needed to ensure the hoisting safety.
5.2.2 Hoisting
S
Se
elle
ec
ctt H
Ho
oiisstt a
an
nd
d S
Sp
prre
ea
ad
de
err
Lift the MV Station with a single hoist or two hoists together.
System Manual