(1) The AC cable must be dimensioned in accordance with the local and
national directives for the dimensioning of cables.
(2) The PV cables must be multi-core cables, of which the maximum withstand
voltage is 600 V and the maximum withstand current is the same as the
short-circuit current.
5.4 Additional Grounding Connection
Since the inverter is a transformerless inverter, neither the negative
pole nor the positive pole of the PV string can be grounded.
Otherwise, the inverter will not operate normally.
Connect the additional grounding terminal to the protective
grounding point before AC cable connection, PV cable connection,
and communication cable connection.
The ground connection of this additional grounding terminal cannot
replace the connection of the PE terminal of the AC cable. Make sure
the two terminals are both grounded reliably.
5.4.1 Additional Grounding Requirements
All non-current carrying exposed metal parts of the equipment and other
enclosures in the PV power system should be grounded, e.g. PV strings frame
and inverter enclosure.
The additional grounding terminal is equipped at the bottom of the inverter. Be
sure to connect this additional grounding terminal for reliable grounding and
ensure that the grounding resistance is less than 10 Ohm.
5.4.2 Connection Procedure
The additional grounding cable should be of the same cross section as the PE
wire in the AC cable.
Additional grounding cable and OT/DT terminal are prepared by customers.