35
Step 4
Remove the protection cover and store the released screws properly.
Step 5
Strip the protection layer and insulation layer by specific length, as described in the
figure below.
Step 6
If wiring of tracking system power cable is required, refer to
. Otherwise, skip performing this step.
Step 7
Make the cable and crimp OT/DT terminal.
User Manual
Содержание SG250HX-IN-20
Страница 2: ......
Страница 6: ......
Страница 10: ......
Страница 65: ...55 E En nd d User Manual 5 Electrical Connection...