18
4.4.2 Hoisting Transport
step 1
Release the sealing screws on the mounting ears and store them properly. Anchor two
M12 thread lifting rings to the hangers of the inverter.
step 2
Lead the sling through the two lifting rings and fasten the tie-down strap.
step 3
Hoist the inverter, and stop to check for safety when the inverter is 100mm above the
ground. Continue hoisting the device to the destination after ensuring the safety.
step 4
Remove the lifting rings and reassemble the sealing screws released in Step 1.
User Manual
Содержание SG125HX
Страница 1: ...User Manual PV Grid Connected Inverter SG125HX SG125HX UEN Ver14 202105 WWW SUNGROWPOWER COM...
Страница 2: ......
Страница 6: ......
Страница 10: ......
Страница 32: ...22 E En nd d 4 Mechanical Mounting User Manual...
Страница 45: ...35 Ensure that the depth L of the socket used is not less than 28mm User Manual 5 Electrical Connection...