Chapter 2
Operation
2-7
FIGURE 2-5
Box ID Switch Location
2.3.1
Connecting One Unit to the Host
1. Check that the box ID is set to 1 before connecting the unit to the host.
2. Invoke the
forcelip
operations in Step 3 of Section 2.5 on pages 2-9 and 2-10.
2.3.2
Daisy Chaining Two Units to the Host
Note –
For daisy-chain cabling applications, refer to Section 1.3.6 “Cabling
Applications” on page 1-8.
1. Check that the box ID of the first unit is set to 1.
2. Set the box ID of the second unit to 2.
3. Connect the second unit to the first unit.
4. Connect the first unit to the host.
5. Invoke the
forcelip
operations in Step 3 of Section 2.5 on pages 2-9 and 2-10.
Box ID switch
Содержание StorEdge MultiPack-FC
Страница 5: ...Regulatory Compliance Statements v...
Страница 6: ...vi Sun StorEdge MultiPack FC Installation Operation and Service Manual August 2000...
Страница 14: ...xiv Sun StorEdge MultiPack FC Installation Operation and Service Manual August 2000...
Страница 16: ...xvi Sun StorEdge MultiPack FC Installation Operation and Service Manual August 2000...
Страница 20: ...xx Sun StorEdge MultiPack FC Installation Operation and Service Manual August 2000...
Страница 24: ...xxiv Sun StorEdge MultiPack FC Installation Operation and Service Manual August 2000...
Страница 34: ...1 10 Sun StorEdge MultiPack FC Installation Operation and Service Manual August 2000...
Страница 50: ...2 16 Sun StorEdge MultiPack FC Installation Operation and Service Manual August 2000...
Страница 55: ...Chapter 3 Service 3 5 FIGURE 3 3 Removing the Power Supply FIGURE 3 4 Drive Cage With Backplane...
Страница 61: ...Chapter 3 Service 3 11 FIGURE 3 9 Opening the Drive Bracket FIGURE 3 10 Removing a Drive...
Страница 71: ...Chapter 3 Service 3 21 FIGURE 3 19 Drive Cage and Chassis Bottom Screws...
Страница 80: ...3 30 Sun StorEdge MultiPack FC Installation Operation and Service Manual August 2000...