4-26
Sun StorEdge D2 Array Installation, Operation, and Service Manual • February 2002
▼
To Replace the Removable Components in the
Chassis
1. Go to the front of the replacement chassis, or turn the chassis so that the front is
facing you.
2. Insert all disk drives taken from the old chassis into the same slot locations they
were in the old chassis.
See “To Install a Disk Drive” on page 4-10.
3. Go to the back of the replacement chassis, or turn the chassis so that the back is
facing you.
4. Insert both fan canisters taken from the old chassis.
See “To Remove and Replace a Fan Canister” on page 4-14.
5. Insert both power supply canisters taken from the old chassis, and reattach the
power cords.
See “To Remove and Replace a Power Supply” on page 4-16.
6. Insert the ESM(s) taken from the old chassis.
See “To Install an ESM” on page 4-21.
7. Connect the SCSI cable(s) to the ESM(s).
8. Turn on the power switches on the power supplies.
9. Check the disk LEDs and the Subsystem LED at the front of the array to ensure
that all components are receiving power and are functional.
10. Close and lock the front door.
11. If you powered off the connected host, power the host on again.
You have completed replacing the chassis.
Содержание StorEdge D2
Страница 10: ...x Sun StorEdge D2 Array Installation Operation and Service Manual February 2002 ...
Страница 50: ...2 12 Sun StorEdge D2 Array Installation Operation and Service Manual February 2002 ...
Страница 92: ...4 28 Sun StorEdge D2 Array Installation Operation and Service Manual February 2002 ...
Страница 98: ...B 2 Sun StorEdge D2 Array Installation Operation and Service Manual February 2002 ...
Страница 104: ...B 8 Sun StorEdge D2 Array Installation Operation and Service Manual February 2002 ...
Страница 114: ...B 18 Sun StorEdge D2 Array Installation Operation and Service Manual February 2002 ...
Страница 118: ...Index 4 Sun StorEdge D2 Array Installation Operation and Service Manual February 2002 ...