LYNX2
‐
SC
for
Optical
Cord
with Tight Buffered Fiber
Assembly Procedure
ETK1123085B
No
twisting
(17) Slide Protection until
it
covers
the
projection
of
the
flange.
(18) Set Sleeve into the heater.
Right side first
Then left side
(19) Confirm the position before
heating.
Sleeve
at
center
f h
t
Button
to
(20) Heat Protection Sleeve.
(21) Pick up Sleeve.
(22) Slide Rear Parts.
No
twisting
No
twisting
Lightly
maintaining
tension
on
fiber
No
twisting
of
heater
No
gap
start
heating
Lynx
heater
program runs
a
fan
to
cool
the
sleeve
after
heating
Be
careful for hot sleeve,
spring and flange even after
the cooling by fan.
!
Rear Parts
(23) Disassemble Boot / Kevlar
(24) Remove Orange Tape then
(25) Pull out Outer Sheath from Rear
(26) Pull out Kevlar from Rear Stopper.
(23) Disassemble Boot / Kevlar
Stopper and Rear Stopper.
(24) Remove Orange Tape, then
disassemble Jacket Stopper.
(25) Pull out Outer Sheath from Rear
Stopper.
(26) Pull out Kevlar from Rear Stopper.
Kevlar
Rear
Stopper
Rear
Stopper
Sheath
Jacket
Stopper
Boot
Rear
Stopper
Kevlar
Stopper
Rotate
counter
‐
clockwise.
(29) Insert the split sheath into Jacket
Stopper and hold them on Rear Stopper.
Jacket
Stopper
Rear
Stopper
APC
‐
Red
dot
PC/UPC
‐
Black
dot
Red
Triangle
Make sure
protrusion of cap.
(28) Push ferrule to the end. Then assemble the housing.
(27) Key Alignment.
1 direction
only
Flange
Design
Never
Twist
Sheath
Never
roll
up
fiber
Align each triangle.
(30) Hold the split sheath by Jacket Stopper.
(31) Slide the furcation tube to the rear stopper.
Furcation
Tube
Rotate
clockwise.
(32) Secure Kevlar by Screw with holding Kevlar.
y
Key
(33) Trim Excess Kevlar by Kevlar Cutter
and
cut
the
tether.
(34) Put Outer Housing.
Key
Kevlar should be kept inside the sheath.
Never
roll
up
fiber
Hold Kevlar Tightly,
otherwise the fiber is danger to be twisted or rolled up.
Copyright
©
2011
Sumitomo
Electric
Industries,
LTD.
y
Cut
Tether
Complete