LYNX2
LYNX2--MPO for Round Cord with 12 or 8 Individual Fibers
MPO for Round Cord with 12 or 8 Individual Fibers
Assembly
Assembly Procedure
Procedure
ETK1123092D
(A) Set Fusion Condition
(B) Perform Arc Test
See the operation manual of T-71M12.
(1) Slide Rear Parts onto
the cord.
(2) Mark at 150mm from the end
of the cord.
(3) Mark Slit by LYNX2-CORDTOOL-2&3.
Set the cord on “3mm” groove.
Set the marking point
at the edge of top
(4) Fold the slit outer sheath and Kevlar
backward. Hold them by a mending tape.
CH1
CH2
CH3
CH4
CH5
CH6
CH7
CH8
CH9 CH10 CH11 CH12
Method A
End A
BL
OR
GR
BR
SL
WH
RD
BK
YL
VI
PK
AQ
End B
BL
OR
GR
BR
SL
WH
RD
BK
YL
VI
PK
AQ
Method B
End A
BL
OR
GR
BR
SL
WH
RD
BK
YL
VI
PK
AQ
End B
AQ
PK
VI
YL
BK
RD
WH
SL
BR
GR
OR
BL
Method C
End A
BL
OR
GR
BR
SL
WH
RD
BK
YL
VI
PK
AQ
End B
OR
BL
BR
GR
WH
SL
BK
RD
VI
YL
AQ
PK
Another
(ex. Corning)
End A
BL
OR
GR
BR
SL
WH
RD
BK
YL
VI
PK
AQ
End B
AQ
PK
VI
YL
BK
RD
WH
SL
BR
GR
OR
BL
Table 1. Fiber Alignment. (See Appendix.)
(5) Fiber standing in line according to Table 1.
The way to align the order in hand
every 4 fiber might be easy.
Push “power
key” for more
than 1 sec.
Arc Test “ON”.
Then perform the arc test
according to the instruction.
*Fiber for testing is included
in the kit.
Please check fiber type
inside the field fiber.
“Main Menu”
Select Fiber Type
Select “Fiber Type”, then “Return”.
“Main Manu”
Select Sleeve Type
Select Sleeve Type
Then “Return”
For 8c
For 12c
Copyright © 2011 Sumitomo Electric Industries, LTD.
(9) Set ribbon fiber on Fiber holder.
(10) Remove Coating (JR-6)
1. Place
3. Slide
Clean rubber clamp
and blade regularly
(12) Cleave the fiber (FC-6M)
No gap
(13) Set fiber holder on the splicer
(left side).
2. Close
Place fiber on
V-groove gently
Spring
(Remove from
Front Parts)
Protection
Sleeve
CH1 Fiber
Front Side
Stainless Steel
Bottom Side
Make sure the
orientation of Sleeve
CH1 Fiber
Front Side
>
>
>
>
25mm
(11) Fiber Cleaning.
Moistened
with alcohol
(8) Slide Rear Parts, Spring and Protection
Sleeve onto the ribbon fiber.
(6) Ribbon Processing.
1. Apply Adhesive
2. Put an adhesion department with a
sponge
3. Move a slide stage
No Bending
No gap between fibers
4. Completion
130mm
>30mm
(7) Cut the fiber to be 130mm and confirm the
length of ribbonized is 30mm or more.
every 4 fiber might be easy.
Ribbon End
Marking
Marking