Installation and Operating Instructions
10000 Inline Series
10000_Inline_Series_EN_20201208_V01.docx
11
8.
After a further 10 minutes of running, stop the machine, switch off and lock the main isolator.
Check the tightness of all securing bolts. Re-check every 500 hours of operating time.
9.
Check the tightness of all cables and connections. Re-check every 500 hours of operating time.
10.
Observe manufacturer’s guidelines with regard to gearbox lubricant initial renewal and
subsequent intervals.
11.
In the event of machine overload (jam), the controller is programmed to activate the following
procedure:
i. Momentarily reverse rotation to clear the condition, then return to normal operation.
ii. If overload re-occurs within 60 seconds, reverse rotation to clear the condition, then return to
normal operation.
iii. If a third overload occurs within 60 seconds of the first, machine shuts down and energises
an alarm circuit.
12.
After machine shutdown, relieve pressure, isolate, and lock off. Inspect machine, remove any
obstruction and reset the controller.
13.
The machine can now be re-started.
Dismantling advice
When servicing the grinder, be certain that the
main isolator is tagged out / locked out. Serious
injury could result from accidental start-up.
1.
Disconnect wiring at motor(s) terminal box(es) and tag leads for identification.
2.
Isolate the grinder from influent.
3.
If necessary, the grinder may be completely removed from installation using the recommended
lifting equipment.
Cleaning / Inspection
It is important to periodically inspect the grinder (timeframe dependent on usage).
Attach lifting equipment and remove the grinder
1.
Steam clean and disinfect all parts of the unit excluding motor, seal assemblies,
gear drive unit and bearings.
2.
Remove any gasket material from joint faces.
3.
Housings should be cleaned thoroughly.
4.
Inspect all parts for excessive wear.
5.
Inspect gears for wear and damage.