![Sulzer Channel Monster CDD Series Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/sulzer/channel-monster-cdd-series/channel-monster-cdd-series_installation-and-operating-instructions-manual_1390465013.webp)
Installation and Operating Instructions
10000 Inline Series
10000_Inline_Series_EN_20201208_V01.docx
8
•
Check paint for any slight damage and touch up if necessary. Standard Sulzer colour (RAL
5002).
Installation
Electrical, mechanical and maintenance work should only be performed by suitably
qualified and competent persons and must be in accordance with relevant electrical and
mechanical regulations.
Attach 3-phase motor power
and any optional thermostat
wiring
Be sure to use both
lifting eyes