![Suez Sievers UPW Boron Analyzer Скачать руководство пользователя страница 26](http://html1.mh-extra.com/html/suez/sievers-upw-boron-analyzer/sievers-upw-boron-analyzer_operation-and-maintenance-manual_1389722026.webp)
SUEZ © 2018
DLM 71000-03 EN
Rev. B
Chapter 2: System Description
System Components
Fluidics Components
Multistream Valve
Analyzers equipped with a multistream valve are capable of sampling two, three, or four supply streams,
depending on the configuration of the Analyzer purchased.
Pressure Regulator
Ensures that the internal pressure of the Analyzer remains at 20 psig.
Zero Column
For a zero measurement to be made, the UPW sample must first pass through the zero column. The zero
column contains two types of ion-exchange resin. The first type is a mixed-bed resin that removes any ionic
contaminants in the sample. The second type is a boron-specific resin that removes any boric acid in the
sample.
Pressure Switch
Detects when there is little or no flow to the Analyzer.
Reagent Pump
Continuously pumps the reagent from the reagent reservoir through the reagent column to de-ionize it. It
also pumps the reagent to the injection valve and the injection loop.
Reagent Column
Contains a mixed-bed resin that de-ionizes the reagent.
Note:
Data cabling, if required, must be installed by a qualified technician. Use
of a watertight cable bushing is required.
Note:
The Boron Analyzer is intended for indoor use only. Avoid mounting the
Analyzer in direct sunlight as it may overheat the unit.
Note:
Avoid installing the Analyzer where it may be subject to splashing fluids.
The fluids may enter the Analyzer through the cooling system openings,
causing damage.
Содержание Sievers UPW Boron Analyzer
Страница 4: ...SUEZ 2018 4 of 104 DLM 71000 03 EN Rev B THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 16: ...SUEZ 2018 16 of 104 DLM 71000 03 EN Rev B THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 24: ...SUEZ 2018 24 of 104 DLM 71000 03 EN Rev B Chapter 1 Introduction THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 64: ...SUEZ 2018 64 of 104 DLM 71000 03 EN Rev B Chapter 5 System Configuration THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 96: ...SUEZ 2018 96 of 104 DLM 71000 03 EN Rev B Chapter 8 Maintenance THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 100: ...SUEZ 2018 100 of 104 DLM 71000 03 EN Rev B Chapter 9 Message and Error Codes THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 103: ...Notes SUEZ 2018 103 of 104 DLM 71000 03 EN Rev B 104...
Страница 104: ...Notes SUEZ 2018 104 of 104 DLM 71000 03 EN Rev B 104...