![Suez Sievers UPW Boron Analyzer Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/suez/sievers-upw-boron-analyzer/sievers-upw-boron-analyzer_operation-and-maintenance-manual_1389722017.webp)
SUEZ © 2018
DLM 71000-03 EN
Rev. B
Warnings
English
Warnings
This symbol on the Analyzer indicates that the user should refer to the manual for
operating instructions.
This symbol on the Analyzer indicates that hazardous voltages can be encountered
within the area so labeled.
This symbol indicates the protective earth terminal (ground) for the Analyzer.
This symbol on the Analyzer indicates that the required input power is AC.
For continued protection against fire hazard, replace fuse with same type and rating.
This symbol indicates that to comply with European Union Directive 2002/96/EC for
waste electrical and electronic equipment (WEEE), the Analyzer should be disposed of
separately from standard waste.
Lifting and carrying the Analyzer should be done with two people handling the unit by the metal
enclosure only.
If this instrument is used in a manner not specified by SUEZ, the protection provided by the instrument
may be impaired.
The wall plug of the AC power cord is the main disconnect device for the Boron Analyzer. High voltage
is present in the Analyzer when the power is connected. To eliminate risk of shock, disconnect the
power to the Analyzer before working inside the Analyzer. The power cord should only be detached from
the Analyzer AFTER powering down the Analyzer by using the power switch on the side and
disconnecting the main plug from the AC wall outlet.
The main plug must be easily accessible because it is the main disconnect device for the Analyzer.
This is a Safety Class I product. It must be connected to a main supply with a protective earth-ground
incorporated into the power cord.
This is a Class A product. In a domestic environment, this product may cause interference in which case
the user may be required to take adequate measures to correct the interference.
Содержание Sievers UPW Boron Analyzer
Страница 4: ...SUEZ 2018 4 of 104 DLM 71000 03 EN Rev B THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 16: ...SUEZ 2018 16 of 104 DLM 71000 03 EN Rev B THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 24: ...SUEZ 2018 24 of 104 DLM 71000 03 EN Rev B Chapter 1 Introduction THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 64: ...SUEZ 2018 64 of 104 DLM 71000 03 EN Rev B Chapter 5 System Configuration THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 96: ...SUEZ 2018 96 of 104 DLM 71000 03 EN Rev B Chapter 8 Maintenance THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 100: ...SUEZ 2018 100 of 104 DLM 71000 03 EN Rev B Chapter 9 Message and Error Codes THIS PAGE IS INTENTIONALLY LEFT BLANK...
Страница 103: ...Notes SUEZ 2018 103 of 104 DLM 71000 03 EN Rev B 104...
Страница 104: ...Notes SUEZ 2018 104 of 104 DLM 71000 03 EN Rev B 104...