Page 15
2-11
#825309 - Revision A - August, 2014
V-Series Cooktop Hoods
V-Series Cooktop Hoods
Installation Information
Island Hood Mounting
Island Hoods have a Support Frame that is adjustable
in height. The Support Frame is attached to ceiling,
the Upper and Lower Chimney is attached, then Hood
Body.
Note:
If an Internal Blower is being installed, mount
Hood Body to Easy Cube/Support Frame prior
to installing Internal Blower. The two pin molex
connector for Hood Lights must be connected
prior to Internal Blower being installed.
1. Use template provided with Island Hood to mark
location of electrical supply and mounting holes for
Support Frame. Actual Template has a 6” diameter
circle for ducting. (See Figure 7)
a. Use 1-1/4” drill to create a hole for electrical
power supply.
b. Place four mounting screws in ceiling in indi-
cated location. Do not tighten screws.
2. Place Support Frame on mounting screws and
tighten mounting screws.
3. Adjust height of Support Frame by loosening four
screws on each arm of Support Frame. This
adjustment can be made prior to mounting Support
Frame if desired. (See Figure 8)
8
5/8”
(219)
Electrical
Location
11"
(279)
Figure 7. Template Example
Support
Arm
Screws
Figure 8. Support Frame
4. Install Damper on top of Easy Cube. Install
Ducting. Connect electrical supply to junction
box. Connect remote/inline blower in electrical
box.
5. Install Upper Chimney.
6. Install Lower Chimney.
7. Install Hood Body to Support Frame.
8. Install Internal Blower.