background image

07CV

MONOLYTE

INSTRUCTION FOR MOBILE UNIBODY 

SCREEN SYSTEM MONOLYTE

Содержание MONOLYTE

Страница 1: ...07CV MONOLYTE INSTRUCTION FOR MOBILE UNIBODY SCREEN SYSTEM MONOLYTE...

Страница 2: ...2 MONOLYTE FRAME with integrated legs 2 different sizes possible 4 x7 2 and 4 11 x 8 9 PROJECTION SCREEN BAG Lined storage bag for projection screen...

Страница 3: ...3 FLIGHT CASE sturdy stackable cases with wheels and buckle belt small LxWxH 48 5 x15 x13 5 123x38x34cm big LxWxH 53 x15 x14 5 134x38x37cm SKIRT MANUAL...

Страница 4: ...4 INDEX GENERAL 5 STANDARDS REGULATIONS AND TECHNICAL SPECIFICATION 5 SAFETY 5 OPERATION MAINTENANCE AND SERVICE 8 WARRANTY 9 FRAME SETUP 10 SURFACE AND SKIRT MOUNTING 12 ACCESSORIES 13...

Страница 5: ...THE MANUAL AND SAFETY This operating manual forms part of the projection screen system and enables a safe and efficient operation The safety section provides information about important safety aspects...

Страница 6: ...of the legs Please follow the instructions in chapter LEG HEIGHTS site 14 Prevent air draft Use additional weights on the base profile of the leg to gain higher stability Use suspension points e g Ea...

Страница 7: ...creen then all plug in and clamp connections must be secured against becoming loose and falling It is not allowed to use the projection surface holding the frame parts in position Falling parts can ca...

Страница 8: ...ap buttons and surface to avoid permanent marks Additionally following instructions have to be adhered to Do not allow the projection surface to get in contact with sharp objects Do not bring printed...

Страница 9: ...ply with the local safety regulations Inappropriate use misuse Use of unauthorized and non trained staff Unauthorized equipment conversions and technical modifications by the operator himself Use of s...

Страница 10: ...ame 2 3 Unfold the frame along the horizontal frame bars so that the legs are directed towards the audience and the snap studs are facing upwards 4 5 Unfold the vertical frame elements 6 7 The snap jo...

Страница 11: ...11 12 14 10 11 13 8 9 BACK 8 9 Lock the corner hinges to gain maximum stability 10 14 Unfold the legs and secure them with the corner hinges Beware of pinch points...

Страница 12: ...y one Please mind the instructions for projection surfaces in chapter OPERATION MAINTENANCE and SERVICE Put the screen upright 4 Open the front leg bars and lock the corner hinges Put the screen uprig...

Страница 13: ...SUSPENSION CLAMP WITH EYEBOLT This adapters for Monolyte can be attached quickly and easily at any point The eyebolt fixes the adapter to the profile offering professional hanging possibilities Avail...

Страница 14: ...2980 DRAPE RUNOFF This universal and transportable Drape System can be used as independent partition to mark out control areas or to allow flexible room design A few elements combined with the telesco...

Отзывы: