Studer Innotec SA
RCC-02/-03
48
User manual
14.8.9.2
New priority cycle on the absorption and equalization phases {1149}
Activate this configuration to accept or interrupt the absorption and equalization phases to start a
new cycle. In the opposite case, even if the conditions are fulfilled for starting a new charge cycle,
the battery charging proceeds normally by following the programmed phases.
In the event of battery charging with renewable energy sources such as solar energy,
for example, this configuration must remain deactivated (*no) in order to avoid cycles
taking place too frequently.
14.8.9.3
Dynamic compensation of battery level for a new cycle {1608}
This parameter makes it possible to take into account the instant power needed to launch a new
charge cycle.
14.8.9.4
Restricted maximum cycle frequency {1147}
14.8.9.5
Minimum duration between cycles {1148}
If you wish to limit the frequency of the charge
cycles, this setting allows you to lock the system
so that a new battery charge cycle will not be
initiated, even if the conditions for doing so
have been met. The duration of the lock does
not depend on the duration of the cycle. It
takes into account the duration between the
start of each cycle.
A: New cycle
B: Presence of AC-In source
C: Floating voltage
If you activate this function and you adjust the duration setting to 24h, you will only have
one charge cycle per day. In this case, if the conditions for a new cycle are met, the
cycle will not take place and the charger will keep the battery at floating voltage.
14.8.10
Absorption phase {1451}
During this phase, the battery accumulates the final percentages of the energy it is storing. This phase
is carried out with a constant voltage.
14.8.10.1
Authorized absorption {1155}
This configuration determines whether or not the absorption phase is used. If this phase is
deactivated, the charger goes directly to the authorized phase that follows it.
14.8.10.2
Absorption voltage {1156}
Use this configuration to adjust the voltage that is used for the absorption phase.
14.8.10.3
Duration of absorption {1157}
Use this configuration to adjust the duration of the absorption. The absorption phase starts once the
set voltage {1156} is reached. When the duration has run out, the charger automatically goes to the
authorized phase that follows it.
Содержание RCC-02
Страница 2: ......
Страница 4: ......
Страница 19: ...Studer Innotec SA RCC 02 03 User manual V4 4 0 15 5 DIMENSIONS 5 1 RCC 02 5 2 RCC 03 ...
Страница 48: ...Studer Innotec SA RCC 02 03 44 V4 4 0 User manual ...
Страница 102: ...Studer Innotec SA RCC 02 03 98 V4 4 0 User manual ...
Страница 103: ......