Stübbe 145039 Скачать руководство пользователя страница 7

Installation and connection

5

Installation and connection

5.1

Preparing for installation

5.1.1

Check operating conditions

1. Ensure the design of the

fi

tting is consistent with the pur-

pose intended:

Materials used (

nameplate).

Medium (

order and design data).

2. Ensure the required operating conditions are met:

Resistance of body and seal material to the medium
(

resistance lists).

Media temperature (

data sheet).

Operating pressure (

data sheet).

3. Consult with the manufacturer regarding any other use of

the device.

5.2

Planning pipelines

5.2.1

Designing pipelines

WARNING

Risk of poisoning and environmental damage from
medium.

Leaks due to impermissible pipework forces.

Ensure that the

fi

tting is not subject to any pulling or thrust-

ing forces or bending moments.

1. Plan pipes safely:

No pulling or thrusting forces

No bending moments

Adjust for changes in length due to temperature
changes (compensators, expansion shanks)

Optional

fl

ow direction

Optional installation position

2. Dimensions (

data sheet).

5.3

Installing

fi

tting in pipe

WARNING

Risk of poisoning and environmental damage from
medium.

Leak due to faulty installation.

Installation work on the pipes should only be performed
by technicians who have been specially trained for the
pipework in question.

NOTE

Material damage due to contamination of the

fi

tting!

Make sure no contamination reaches the

fi

tting.

Flush the pipe with a neutral medium.

The

fi

tting is installed according to the connection type of

the pipes.

5.3.1

Connection with solvent welding/butt-weld
spigot ends

Do not connect the ASV valve body in the version “

fi

xed

connector” by means of butt-welding.
This applies to the heating element as well as infrared butt-
welding procedures.

1. Prepare pipe ends according to connection type.
2. Adhesively apply or weld

fi

tting with solvent welding/butt-

weld socket ends (

manufacturer speci

fi

cations).

5.3.2

Connection with

fl

ange

1. Prepare pipe ends according to connection type.
2. Radially push the

fi

tting and

fl

at seal between the

fl

ange

ends.

3. Bolt

fi

tting and

fl

ange with

fl

ange screws, nuts and wash-

ers.
While

doing

so,

observe

tightening

torques:

(

9.2 Tightening torques, Page 13).

5.3.3

Connection with union nut and insert

1. Prepare pipe ends according to connection type.
2. Unscrew union nuts and slide over free pipe ends.

Check mounting direction.

3. Connect inserts with pipe ends.
4. Position

fi

tting between the pipe ends.

5. Hand-tighten the union nut.

300 156

BA-2016.08.04 EN

MV 309

7

Содержание 145039

Страница 1: ...00 156 TR MA DE Rev001 ASV St bbe GmbH Co KG Hollwieser Stra e 5 32602 Vlotho Germany Phone 49 0 5733 799 0 Fax 49 0 5733 799 5000 E mail contact asv stuebbe de Internet www asv stuebbe com We reserve...

Страница 2: ...8 5 4 1 Installing limit switch 9 5 4 2 Pneumatic connection 9 5 4 3 Checking the function of the drive 9 5 5 Performing the hydrostatic test 9 6 Operation 9 6 1 Commissioning 9 7 Maintenance 10 7 1 S...

Страница 3: ...uments especially all safety instructions and warnings 1 2 Other applicable documents Resistance Guide Chemical resistance of the materials used http www asv stuebbe de pdf_resistance 300051 pdf Data...

Страница 4: ...plicable documents especially the safety maintenance and repair information before they start any work Organize responsibilities areas of competence and the supervision of personnel The following work...

Страница 5: ...5 Date of manufacture Series number 3 2 Layout Compressed air operated diaphragm valve for shutting off pipelines or regulating systems Optional flow direction Valve lift OPEN CLOSE Optional installa...

Страница 6: ...eet 4 3 Storage NOTE Material damage due to inappropriate storage Store the fitting properly Make sure the storage room meets the following condi tions Dry Frost free Vibration free Not in direct sunl...

Страница 7: ...stallation work on the pipes should only be performed by technicians who have been specially trained for the pipework in question NOTE Material damage due to contamination of the fitting Make sure no...

Страница 8: ...witch type VCSP A closed B open Fig 4 Limit switch type Nj2 V3 N A closed B open R R Fig 5 Limit switch type NBB2 V3 E2 R Load A closed B open A X X1 X2 B Fig 6 compressed air A Close valve B Open val...

Страница 9: ...losed NC open Normally open NO close Double acting DA close open Tab 3 Compressed air connection 5 4 3 Checking the function of the drive Open and close fitting using the pneumatic connection the indi...

Страница 10: ...E EPDM 100 000 Tab 4 Diaphragm maintenance interval 1 Applies for water at 20 C Under different conditions chemicals media that contains solids abrasives shorten the maintenance intervals 7 2 Maintena...

Страница 11: ...properly 6 Ensure that pressure piece 3 3 is exposed in the guides 7 Check state of sealing surfaces of the valve body 1 for damage 8 Lightly lubricate new diaphragm with special grease on top of cur...

Страница 12: ...pilot valve Check compressed air connection and correct if necessary supplementary instructions for drives Control function is not right Electrical connection faulty Check electric connect and correct...

Страница 13: ...NO 6 bar DA 4 bar Compressed air classes according to ISO 8573 1 2 or 3 at T 0 C 3 or 4 at T 0 C Control pressure diagram data sheet 9 2 Tightening torques Description Size Tightening torque Nm Housi...

Страница 14: ...Appendix 14 MV 309 BA 2016 08 04 EN 300 156...

Отзывы: