
28
3006-209-001 REV B
www.stryker.com
Operation
Lowering the siderails (Continued)
Figure 16: Siderail lowest position
Positioning the optional two-stage permanently attached IV pole
CAUTION
Do not load the IV pole above the safe working load of 40 lb (18 kg).
Note:
The two-stage permanently attached IV pole is an option that was installed at either the head, foot, or both ends
of the bed. This choice was made when the product was purchased.
To position the IV pole:
1.
Lift and pivot the IV pole from the storage position and push down until the IV pole locks into the receptacle.
2.
To raise the height of the pole, pull up on the telescoping portion (A) of the pole until it locks into place at its fully
raised position (
3.
Rotate the IV hangers (B) to the desired position and hang the IV bags (
).
4.
To lower the pole, turn the latch (C) clockwise until the telescoping portion (A) lowers into the bottom tube (
5.
Lift up and pivot the pole down into the storage position.
Содержание S3 MEDSURG BED
Страница 2: ...sample text ...
Страница 67: ...www stryker com 3006 209 001 REV B 63 Operation iBed Locator option Continued A Figure 59 iBed Locator ...
Страница 72: ...68 3006 209 001 REV B www stryker com Preventive maintenance Product serial number Completed by Date ...
Страница 79: ...2016 11 3006 209 001 REV B www stryker com Stryker Medical 3800 E Centre Avenue Portage MI 49002 USA ...