![Struers Cooli System 1 Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/struers/cooli-system-1/cooli-system-1_instruction-manual_1385628021.webp)
5.5
Connection to the machine
1.
Connect the water outlet hose of the cooling unit to
the quick coupling on the machine.
2.
Connect the 24 V/CAN control cable to the control
unit:
–
Plug one of the cable end into the machine's
control socket (see the machine manual for
specific information on how to do this).
–
Plug the other end into the socket on the rear
panel of the Cooli System control unit.
3.
Place the pump on the tank.
4.
Secure the pump and connect it to the control unit.
5.
Connect the cooling unit to the power supply.
6.
Place the cooling unit under the outlet on the
connected machine, or lead the outlet hose from
the machine into the filter unit on the cooling tank.
6
Operate the device
6.1
Filling the tank
1.
Place a clean plastic liner in the tank.
2.
Make sure that the liner lies flat on the base of the tank so that it does not block the pump.
3.
The wheels of the unit must be in line with the sides of the compartment so that you can
move the unit into position without having to wiggle it from side to side.
CAUTION
The cooling unit will be very heavy when it is full.
Place the cooling unit in its final position, or make sure that you can easily push it
into position before filling the tank.
Note
To prevent corrosion, Struers recommends using the Struers additive in the
cooling fluid. For more information, see the additive container.
Remember to top up with Struers additive each time you fill up the tank with water.
For machines which mainly cut copper and copper alloys, use Corrozip-Cu.
6 Operate the device
Cooli System
21