Unpacking the Cabinet
1-4
Stratus ftServer V 6624 Hardware Installation Guide
(R005S)
Figure 1-1. Cabinet Packaged for Shipping
1. Check the packing list to verify that you have received the correct shipment.
2. Verify that the Shockwatch indicators on the outer sides of the shipping container
have not been activated.
N O T I C E
If you received the wrong shipment, or if a handling
indicator has been activated,
do not proceed with the
unpacking
. Contact the CAC immediately.
3. Verify that the area through which you must move the system has adequate
clearance, as the following figures indicate:
shows the dimensions of a packaged 38U cabinet.
shows the clearances required at the installation site.
Include the height of the pallet jack when you calculate the overall system height.
upk001a
Ramp
Pallet
Tie-down
Straps
Transition
Plates
Lever Bar
Содержание V 6624
Страница 1: ...Stratus Technologies R005S 00 Stratus ftServer V 6624 Hardware Installation Guide...
Страница 8: ...Tables viii Stratus ftServer V 6624 Hardware Installation Guide R005S...
Страница 32: ...Disposing of Shipping Materials 1 20 Stratus ftServer V 6624 Hardware Installation Guide R005S...
Страница 78: ...Replacing a U779V Fabric Switch A 24 Stratus ftServer V 6624 Hardware Installation Guide R005S...