
11
4.3
-
Column Installation
4.3.1
-
Lift the carriage to the first lock position to ensure that the mechanical lock is locked in place to facilitate the
installation of expansion bolts.
4.3.2
-
According to the dimensions of foundation, measure the position of the main and auxiliary columns, check
the position and dimensions of the bottom plate, and drill the expansion screw fixing holes, clean up the drilling
dust.
4.3.3
-
Check the vertical calibration of the column by using the horizontal instrument. If necessary adjust the gasket
under the bottom plate, and the length of the gasket should be same as the side length of the bottom plate pressed
on it.
4.3.4
-
Use expansion bolts to secure the base plate of the column to the foundation.
4.4
-
Installation of balanced wire rope
4.4.1
-
Firstly adjust the two sides of the carriage to the same height.
4.4.2
-
As the below pictures, connect the wire rope.
4.4.3
-
After installing the wire rope, adjust the tightness of the wire rope by adjusting the crew cap of the rope
head, and judge by the sound of the safety on both sides when rising , such as the same sound, indicating that the
debugging has been completed, or through the rising process, the height of the carriage on both sides is the same.
In the process of falling, the carriage drops to the lowest point, and the arm safety lock is completed.
4.4.4
-
Use No.1 lithium grease to lubricate the wire rope.( this step cannot be omitted).
Содержание SAE-F10S
Страница 24: ...24...