Required Tools
Installing the System in a Cabinet
9-3
Required Tools
Tools required for installing a cabinet system:
A #2 Phillips-head screwdriver
A flat-head screwdriver and a cage-nut insertion/extraction tool
C A U T I O N
!
To avoid personal injury or damage to the system, two
persons are required to install the system in a cabinet.
M I S E E N G A R D E
!
Pour éviter toute blessure ou dommage au système, deux
personnes sont nécessaires pour installer une armoire.
Numbering the Vertical Rails
If the holes in the vertical rails of your cabinet are not already numbered, use a marker
or pencil to number the middle hole of at least the following:
The 4U in which to install each shelf unit
The 2U in which to install each pair of PDUs, if ordered
The 2U in which to install each storage enclosure, if ordered
N O T E
The cabinet rails, system, and various components are
measured in Electronic Industries Alliance (EIA) rack
units (U). Every three holes on the EIA square-hole
pattern on the vertical rail equals one U (1.75 in.,
4.45 cm). The holes on EIA rails are located in a repeating
pattern of 1/2 in. (1.27 cm), 5/8 in. (1.59 cm), 5/8 in.
(1.59 cm), as shown in
. The middle hole of
each U has equal spacing between it and the holes
adjacent to it. In some cabinets, numbers on the vertical
rails identify the middle hole of each U.
Содержание ftServer 2900 Series
Страница 10: ...Tables x Stratus ftServer 29x0 49x0 and 69x0 Systems Site Planning and Installation Guide R786 ...
Страница 40: ...Planning for Cables 3 4 Stratus ftServer 29x0 49x0 and 69x0 Systems Site Planning and Installation Guide R786 ...
Страница 62: ...Monitor Requirements 6 6 Stratus ftServer 29x0 49x0 and 69x0 Systems Site Planning and Installation Guide R786 ...