![Stratus ftServer 2510 Скачать руководство пользователя страница 59](http://html1.mh-extra.com/html/stratus/ftserver-2510/ftserver-2510_site-planning-manual_1383762059.webp)
Telephone Line Connections
Communications Line Planning
4-9
Telephone Line Connections
The system requires up to two telephone cables, and related connection points:
One telephone line for use when calling for service
One analog telephone line to connect the ASN modem, if used, to a telephone
connection point
A 7-ft (2.13m) telephone cable is shipped with the modem assembly.
1
N O T E
A dedicated phone line provides the most reliable service
for ASN connections. ASN calls routed through a PBX
might be slow due to the load on the PBX, or might not
complete successfully because the calls can become
disconnected. If you must use a PBX, do not route the
telephone extension through a switchboard; instead,
provide a direct-dial analog number.
If no modem is installed, a second telephone line is not necessary. A modem is not
necessary in the following situations:
If your system will connect to a network with Internet access, you may choose to
use the Internet to send alarms to the ASN and allow the CAC or your authorized
Stratus service representative to connect to your system over the Internet for
troubleshooting.
If you implement ftGateway groups, only one system in the group requires a
modem. See
“Site Planning for Systems in an ftGateway Group”
for more
information.
N O T E
ftSSS for VMware vSphere does not support VTMs or
ftGateway groups.
1
The telephone cable is not shipped with orders destined for the Republic of
Korea.
Содержание ftServer 2510
Страница 1: ...Stratus Technologies R627 04A Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide...
Страница 8: ...Tables viii Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 12: ...Preface xii Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 46: ...Grounding Requirements 2 18 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 50: ...Planning for Cables 3 4 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 62: ...Modem Requirements for Brazil 4 12 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 68: ...Sample PDU Usage Calculation 5 6 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 96: ...Electrical Power Connectors B 10 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 104: ...Index Index 4 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...