![Stratus ftServer 2510 Скачать руководство пользователя страница 57](http://html1.mh-extra.com/html/stratus/ftserver-2510/ftserver-2510_site-planning-manual_1383762057.webp)
Ethernet Cables
Communications Line Planning
4-7
U574F-LC Dual-Port
1000Base-SX Fiber
Ethernet PCI Adapter
(gigabit fiber-optic
adapter for servers)
1 for each
port, typically
teamed for
fault tolerance
N/A. You must
supply these
cables.
The maximum
distance
between the
U574F-LC PCI
adapter and a
switch is 902 ft
(275m).
Multimode, 62.5- or 50-micron,
DUAL fiber cable with LC-type
connectors to the PCI adapter, and
connectors on the other end that
are compatible with your site
network switch.
ftScalable Storage
RAID controller tray
‡
3: two for each
controller tray
and one to a
management
PC
N/A. You must
supply these
cables.
24 AWG Unshielded Twisted Pair
(UTP) EIA/TIA-Verified, Category-3
or Category-5 wire, with RJ-45
modular connectors terminated with
pair-wiring adhering to the EIA/TIA
568-A or EIA/TIA 568-B standard.
For connections to an Ethernet hub
or switch, provide a
straight-through cable.
For 100-Mbps (fast Ethernet)
operation, provide full-duplex, or
Category-5 Ethernet cables.
† Your system may not contain
, which are optional in Windows and Linux systems, and not
available in ftServer systems running VMware ESX.
‡ ftScalable Storage systems are optional. If you connect an ftServer system running VMware ESX
to an iSCSI or EMC storage system, consider its Ethernet network requirements in your site planning.
Table 4-3. Customer-Supplied Ethernet Cables (Continued)
Component
Quantity
Marketing
ID/Cable Length
Cable Type
Содержание ftServer 2510
Страница 1: ...Stratus Technologies R627 04A Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide...
Страница 8: ...Tables viii Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 12: ...Preface xii Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 46: ...Grounding Requirements 2 18 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 50: ...Planning for Cables 3 4 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 62: ...Modem Requirements for Brazil 4 12 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 68: ...Sample PDU Usage Calculation 5 6 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 96: ...Electrical Power Connectors B 10 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...
Страница 104: ...Index Index 4 Stratus ftServer 2510 4410 and 6210 Systems Site Planning Guide R627...