Grounding Requirements
3-18
Stratus ftServer 2500, 4400, and 6200 Systems: Site Planning Guide
(R609)
Grounding Requirements
W A R N I N G
!
Incorrect grounding can cause severe personal injury
and extensive equipment damage.
The ftServer system obtains an earth reference ground over independent ground
connections to the cabinet frame. Ensure that a high-integrity safety-ground conductor
is installed as part of the wiring system.
See
“Grounding Considerations” on page B-1
for a more complete discussion of
ftServer system grounding.
Table 3-16. System Power (Jumper) Cables to Connect ftServer Systems to PDUs
Marketing ID
Plug Type to System
Plug Type to PDU
Rating
Length
B50502F
IEC 60320 C13
IEC 60320 C14
10A/250V
2.0m
Содержание ftServer 2500
Страница 1: ...Stratus Technologies R609 04A Stratus ftServer 2500 4400 and 6200 Systems Site Planning Guide ...
Страница 5: ...Contents Contents v Index Index 1 ...
Страница 12: ...Preface xii Stratus ftServer 2500 4400 and 6200 Systems Site Planning Guide R609 ...
Страница 29: ...Safety Notices Site Planning for ftServer 2500 4400 and 6200 Systems 1 17 W A R N I N G ...
Страница 30: ...Safety Notices 1 18 Stratus ftServer 2500 4400 and 6200 Systems Site Planning Guide R609 ...
Страница 56: ...Planning for Cables 4 4 Stratus ftServer 2500 4400 and 6200 Systems Site Planning Guide R609 ...
Страница 68: ...Modem Requirements for Brazil 5 12 Stratus ftServer 2500 4400 and 6200 Systems Site Planning Guide R609 ...
Страница 74: ...Sample PDU Usage Calculation 6 6 Stratus ftServer 2500 4400 and 6200 Systems Site Planning Guide R609 ...
Страница 98: ...Electrical Power Connectors B 10 Stratus ftServer 2500 4400 and 6200 Systems Site Planning Guide R609 ...
Страница 106: ...Index Index 4 Stratus ftServer 2500 4400 and 6200 Systems Site Planning Guide R609 ...