
9-4
XY Table Assembly Installation Checklist
If you have any questions before or during installation, do not hesitate to call your Customer
Support provider.
Replace the XY table Assembly.
Verify that all electrical leads are connected correctly
Perform the XY Leveling procedure
Check/Adjust the X-Drive Belt tension
Check/Adjust the Y-Drive Belt tension
Manually move the table in both the X and Y direction to ensure it moves smoothly.
Clean and vacuum the system.
Power system up and verify that system homes correctly.
Load material.
Perform the Part Based Calibration procedure.
Perform the Z Calibration and XY Offset Calibration.
Unload material.
Remove the system CD from the electronics bay and discard.
Using MaracaEX select “Get” to send the .cal file from the system to a new blank CD. Place
the new CD in the electronics bay and secure the rear door.
Load material.
Run a small test part to ensure part quality is acceptable and that the XY table is functioning
correctly.
Discuss with the customer any questions or issues they may have.
Pack the old XY table into the shipping box along with the RMA documentation and ship
back to Stratasys.
Содержание uPrint
Страница 1: ...uPrint and uPrint Plus uPrint SE and uPrint SE Plus Service Manual Part No 209010 0001 Rev D...
Страница 11: ...1 2...
Страница 35: ...2 24...
Страница 178: ...uPrint uPrint SE Service Manual 4 131 Figure 4 230 uPrint and uPrint SE measurement points and worksheet BL FL FR BR...
Страница 179: ...4 132 Figure 4 231 uPrint Plus and uPrint SE Plus measurement points and worksheet BL FL FR BR...
Страница 207: ...4 160 Figure 4 275 uPrint and uPrint SE measurement points and worksheet BL FL FR BR...
Страница 267: ...5 58...
Страница 343: ...6 76...
Страница 359: ...7 16...
Страница 373: ...8 14...