
uPrint/uPrint SE Service Manual
9-3
Toggle Head Assembly Installation Checklist
If you have any questions before or during installation, do not hesitate to call your Customer
Support provider.
Replace the Toggle Head Assembly.
Verify that all electrical leads are connected correctly.
Clean and vacuum the system.
Power system up and verify that head reaches temperature and the system homes correctly.
Using DataStat or MaracaEX enter the Z Tip to Tip value that came with the head and cycle
power.
Load material.
Perform the Z Calibration and XY Offset Calibration.
Run a part to ensure part quality is acceptable and that head is functioning correctly.
Unload material.
Remove the system CD from the electronics bay and discard.
Using MaracaEX select “Get” to send the .cal file from the system to a new blank CD. Place
the new CD in the electronics bay and secure the rear door.
Load material.
Discuss with the customer any questions or issues they may have.
Pack the old Toggle Head Assembly into the shipping box along with the RMA
documentation and ship back to Stratasys.
Содержание uPrint
Страница 1: ...uPrint and uPrint Plus uPrint SE and uPrint SE Plus Service Manual Part No 209010 0001 Rev D...
Страница 11: ...1 2...
Страница 35: ...2 24...
Страница 178: ...uPrint uPrint SE Service Manual 4 131 Figure 4 230 uPrint and uPrint SE measurement points and worksheet BL FL FR BR...
Страница 179: ...4 132 Figure 4 231 uPrint Plus and uPrint SE Plus measurement points and worksheet BL FL FR BR...
Страница 207: ...4 160 Figure 4 275 uPrint and uPrint SE measurement points and worksheet BL FL FR BR...
Страница 267: ...5 58...
Страница 343: ...6 76...
Страница 359: ...7 16...
Страница 373: ...8 14...