Stratasys OBJ-14000 Скачать руководство пользователя страница 1

Stratasys Confidential and Proprietary Information

Objet

 

Desktop

3

D

 

Printer

Site

 

Preparation

 

Guid

e

Rev.

 

D

2

DOC

04002

Содержание OBJ-14000

Страница 1: ...Stratasys Confidential and Proprietary Information Objet Desktop 3 D Printer Site Preparation Guide Rev D2 DOC 04002...

Страница 2: ...stored in a database or retrieval system without prior permission in writing from Stratasys Ltd If this document is distributed as a PDF file you may print it for internal use February 2013 DOC 04002...

Страница 3: ...8 3 3 Equipment 8 3 4 Unloading Space 9 3 5 Unloading Assistance 9 3 6 Training 9 4 Site Requirements 4 1 Floor Area 10 4 2 Table Height Strength 11 4 3 Clear Space Above the Printer 11 4 4 Doors and...

Страница 4: ...Objet Desktop 3 D Printer Site Preparation Guide DOC 04002 4 Rev D2 5 11 Storage of Printing Materials 18 5 12 Fire Control 19 Site Preparation Checklist 20...

Страница 5: ...n activities must be completed before the installation date it is important for the customer to read this guide thoroughly and to complete the Customer Site Preparation Checklist at the end of this gu...

Страница 6: ...bjet 3 D printer 2 2 Size and Weight The following table shows the size and weight information for the printer 2 3 Start Up Kit The printer comes equipped with a start up kit which includes tools and...

Страница 7: ...atula and a loupe for regular operation and maintenance The tools are kept in a special pouch Consumable items wiping cloths pink paper transparencies and so on to maintain the printer for approximate...

Страница 8: ...atasys certified Customer Support Engineers will advise the customer on site preparation upon request 3 2 Shipping Pallets The printer arrives on a wooden pallet The pallet s approximate size and weig...

Страница 9: ...re are no obstructions 3 5 Unloading Assistance The customer must provide professional unloaders to unload the pallets and transfer them to the site The unloaders will assist the distributor s personn...

Страница 10: ...for loading materials and removing printed models 4 1 Floor Area For convenience Stratasys recommends that you place the printer on a stable table or stand with lockable wheels You can order a printer...

Страница 11: ...use must be USB type devices Shelves and cabinets may be located in the vicinity of the printer to allow convenient storage of tools parts accessories manuals and containers or model support material...

Страница 12: ...oors and Hallways A minimum width of 65 cm 2 feet 2 inches is required for the printer to pass through 90 cm 3 feet when the shipping pallet is included If the printer must be turned for example to en...

Страница 13: ...directly from the main electrical panel without any tapped feeds on the line 5 1 2 Grounding The printer is grounded through a single phase AC plug Make sure that the ground connection in the wall out...

Страница 14: ...have a USB alert output for graceful system shutdown Do not use a UPS device which only has a Serial Com signal output RS 232 Protocol 5 2 2 Specifications Refer to the relevant voltage below when sel...

Страница 15: ...Service Pack 2 Microsoft Vista Microsoft Windows 7 Professional Ultimate and Enterprise versions only Macintosh operating systems are not supported Graphics Card Supporting Open GL 512 MB of memory Se...

Страница 16: ...equired near the server workstation Figure 5 1 Network connection 5 7 Heat Dissipation Table 7 describes the heat dissipation of the system units Objet 3 D printing system Crossed Network Cable 5 m 16...

Страница 17: ...where the printing system is operated see section 5 8 2 The ventilation system should have the capacity to replace all of the air in the room four times an hour 5 9 Waste Disposal for Model Support M...

Страница 18: ...inting materials should be stored in conformance with applicable fire department and insurance company regulations and other applicable laws regulations codes and guidelines 5 11 2 Shelf Life Printing...

Страница 19: ...19 Rev D2 5 12 Fire Control A gas fire extinguisher should be used in case of fire in or near the system Other extinguishers are also acceptable but the use of liquid fire extinguishers must be avoid...

Страница 20: ...ed engineer if you have any questions related to the checklist and its implementation Please be aware that Stratasys technical staff will not be able to arrive on site for installation and train ing u...

Страница 21: ...or area and strength section 4 1 Room layout section 4 1 Access to final site doors hallways etc section 4 4 Electrical power supply and outlets sections 5 1 1 5 1 3 Circuit breaker section 5 1 1 Grou...

Отзывы: