EQUIPEMNT AND TOOLS FOR
INSTALIATION
1.
Measuring tape
2.
String for alignment
3.
Step ladder
4.
Welder
5.
Sledge hammer
6.
Wrench
7.
Scissors
INSTALLATION PROCESS
A—BASE INSTALLATION
Please refer to the diagram (Figure 1) to place the base plates. (
UNIT: m
)
Figure 1
1.
The measure is from center to center of the tubes. Referring to the above diagram and confirm
the place of the base plates. ENSURE THAT THE FOUNDATIONS IS SQUARE.
2.
There are two holes on the Base Plates, please using stake Pegs (No.10). THUS ALL BASE
PLATES ARE SECURED.
Note
: The Stake Pegs apply for normal conditions, not suitable to the rock ground,
frozen soil and concrete ground.