C - ROOF COVER INSTALLATION 

NOTE:

 DO NOT install the cover onto the frame of your building in high wind conditions. A 

slight breeze is the most advantageous for cover installation. To take advantage of the 
breeze, pull the cover up over the arches with the breeze blowing in the cover like a sail 
filled with air. 

1.

 

Insert the 

Tensioning tube 

(part code 10) into the pockets on the end of the 

roof 

cover

 (part code 13). Then put the 

Plastic plugs 

(part code 15).  

 

Figure 6 

2.

 

Put the 

Roof cover

 (part code 13) EVENLY, CAREFULLY AND SLOWLY atop the 

frame. Adjust the cover so that it is square and evenly centered on the frame. 

 

Figure 7 

Содержание DT Container shelter

Страница 1: ...1 SHELTER ASSEMBLY MANUAL 40x80x15 DT Container shelter Double Truss...

Страница 2: ...p tensioning device 16 6 Clips 32 7A Left base plate 11 7B Right base plate 11 8 Ratchet 22 9 Nylon band for ratchet 22 10 Tensioning tube 2 groups 11 Bolts M8x70 176 0 Bolts M12x30 132 12 Bolts M10x8...

Страница 3: ...steel into the hole making sure 3ft is below the surface completely laying on the side of the containers 3 Weld the square steel to the 2 containers 4 Pour cement in the holes to make sure the square...

Страница 4: ...of Single truss framing Customer responsibility 4 It s the owner s responsibility to shovel snow off the canopy rooftop 5 All containers need to be anchored to the ground in each opposite corner sides...

Страница 5: ...y to take off snow immediately otherwise it will slide off on its own READ ALL INSTRUCTIONS BEFORE ASSEMBLY 1 Keep the work area clean Accidents are more likely in cluttered areas Do not set up near s...

Страница 6: ...LATION PROCESS A BASE PLATES INSTALLATION Please refer to the Figure 1 to place the base plates Figure 1 1 The measure must be taken from center to center of the base plates Refer to the diagram above...

Страница 7: ...e Top Bent Tube part code 1 the Side Bent Tube part code 2 and the Lower Bent Tube part code 3 with the Bolts M8x70 part code 11 these make one group of arches Please NOTE the direction of the bolt DO...

Страница 8: ...rches connect the Purlin part code 4 onto them using the Bolts M10x80 part code 12 There are 7 pieces of Purlins part code 4 between each arch 4 Install the Inclined Top tension device part code 5 usi...

Страница 9: ...e pull the cover up over the arches with the breeze blowing in the cover like a sail filled with air 1 Insert the Tensioning tube part code 10 into the pockets on the end of the roof cover part code 1...

Страница 10: ...e Nylon band for ratchet part code 9 to tie down the Tensioning tubes Figure 8 4 Weld the Angle seats part code 16 on each container and use Knitting Rope for Cover part code 14 to knit the cover on t...

Страница 11: ...HED UNDER ANYCIRCUMSTANCES until the final assembly and tightening has been completed The process is quite easy but some tightening adjustments will be necessary to get a flat tensioned roof cover Ple...

Отзывы: