SHELTER
ASSEMBLY MANUAL
Model # W60 x L40 x H 15ft
C6040S Back wall & frame of Container Shelter
C6040S Back wall & frame
Страница 1: ...SHELTER ASSEMBLY MANUAL Model W60 x L40 x H 15ft C6040S Back wall frame of Container Shelter C6040S Back wall frame...
Страница 2: ...sibility to take of snow immediately if not slide off by itself READ ALL INSTRUCTIONS BEFOREASSEMBLY 1 Keep work area clean Cluttered areas invite injuries Do not set up near snow drifts in slippery p...
Страница 3: ...or post at left 1 8R Middle door post at right 1 9L Upper door post at left 1 9R Upper door post at right 1 10 Door beam 1 Group 11 Door boom 1 12 Horizontal tube for front endwall 6 12A Top horizonta...
Страница 4: ...22 Bolts M10 90 12 23 Bolts M12 30 36 24 Bolts M10 30 4 25 Front cover 1 26 Rope 1 27 Plastic Plug 12 28 Added door frame 2 29 Added legs 2 30 Added side legs 2...
Страница 5: ...ent 3 Step ladder 4 Welder 5 Sledge hammer 6 Wrench 7 Scissors INSTALLATION PROCESS A FRAME INSTALLATION Figure 1 There are four base plate comes with the back endwall Each of them should be placed in...
Страница 6: ...tall the cover onto the frame of your building in high wind conditions A slight breeze is the most advantageous for cover installation To take advantage of the breeze pull the cover up over the arches...
Страница 7: ...Figure 3 The process is quite easy But some tightening adjustments will be necessary to produce a flat Please adjust the cover timely 2...