6
Figure 4
3.
After finishing installing the first two arches, connect the Connection purlins onto them by
using screw M10x80
(
No.12
)
.There are 7 pieces of Connection Purlins (No.4) between each
arch. Then install the third arch into base plate and connect the purlins. Finally install the Top
Tension Device (No.5) using bolt and Clip (No.6). Assemble the Frame by turns like this.