background image

-  19  -

Maintenance

MAINTENANCE, LUBRICATION

AND ADJUSTMENT

To get long and trouble free service from your new

CF Power Trowel, it is essential to perform peri-

odic maintenance on engine and machine mecha-

nisms.  Follow the guidelines listed below:

LUBRICATION

A.

ENGINE CRANKCASE

Daily--

check oil level in engine.  Engine warranty

is VOID if it is run without oil.  Add oil as re-

quired to keep crankcase full.  Engine oil should

be changed every 250 hours of operation, or once

a  year,  whichever  comes  first.  See  Lubrication

Specification section for engine.

Maintenance, Lubrication, Ad-

justment/Lubrication/Trowel

Gearcase/Arm Bearing

These oil requirements are general guidelines only,

for  specific  requirements  consult  the  ENGINE

MANUAL included with the unit.

B.

TROWEL GEARCASE

Daily--

check oil level in gearcase.  Trowel war-

ranty is VOID if run without oil.  Oil level should

fill the sight plug, located on the right side of the

gearcase, when the unit is at rest on a level sur-

face.  Add oil as required to keep oil level at cor-

rect height.  Gearcase oil should be changed ev-

ery 250 hours of operation, or once a year, which-

ever comes first. See Lubrication Specification

section when adding or replacing gearcase oil.

C.

ARM BEARING

Monthly--

grease arm bearing through the grease

fittings in the spider.  There are (3) fittings on (3)

arm trowels and (4) fittings on (4) arm trowels.

Pump grease into each fitting until clean grease

comes out of spider at either end, thoroughly clean

excess grease off from spider when all arms have

been greased.  See Lubrication Specification sec-

tion for grease requirements.

D.

THRUST BEARING

Weekly

--grease with any grade 1 Lithium based

grease to purge out any dirt or water.  Wipe off

excess grease. See Lubrication Specification

section for grease requirements.

Yearly

--for bearing lubrication remove thrust

bearing and clean thoroughly. Inspect for

damage and replace if necessary or repack with

grease and reinstall. Refer to Spider Assembly

Removal section in your Parts/Service Trowel

Manual, P/N 56354 for spider removal.

Содержание CF24E

Страница 1: ...OPERATOR MANUAL MODELS CF24E CF364 CF464 CF484 4 Blades POWER TROWEL A 100 employee owned American manufacturer REVISION E 2 2003 P N 56353...

Страница 2: ......

Страница 3: ...chine 14 Standard Features 15 Preparation for Service 15 Location and Use of Controls 16 Adjust Tilt Lock Nut 17 OPERATIONS 18 To Start 18 To Shut Off 18 Initial Operation 18 Floating Operation 18 Fin...

Страница 4: ...roper maintenance and the use of incorrect operating materials are not covered by the warranty The above information does not extend the warranty and liability conditions of business of Stone Construc...

Страница 5: ...ication to this warranty or additional warranties binding on Manufacturer Therefore additional statements whether oral or written do not constitute warranty and should not be relied upon The Manufactu...

Страница 6: ...ented Dyna Clutch Reinforced contoured T handle Throttle turns w 1 4 turn locking cast iron rotating hand lift oil sight gauge assembled cushioned handgrips rotating guard 2 year gear case STONE CF364...

Страница 7: ...figuration Sound Pressure CF364 5 5 Honda CF464 8 Honda CF484 11 Honda at operator s ear 92dBA 93dBA 93dBA RMS acceleration on the handle were measured per the following meter sec 2 RMS 8 27 1 5 Sound...

Страница 8: ...44 Nm 3 4 16 750 315 ft lbs 427 Nm 7 8 9 875 501 ft lbs 679 Nm 1 12 1 000 746 ft lbs 1011 Nm 1 14 1 000 764 ft lbs 1036 Nm SAE GRADE 5 Coarse Thread SIZE PLATED 1 4 20 250 6 ft lbs 8 Nm 5 16 18 3125 1...

Страница 9: ...Thread Fine Thread SIZE Nm ft lbs Nm ft lbs M6 14 10 14 10 M8 34 25 35 26 M10 67 49 68 50 M12 117 86 125 92 M14 185 136 192 142 M16 285 210 295 218 M20 550 406 600 443 M24 950 701 1000 738 Property Cl...

Страница 10: ...10 Technical Data Hardware Key...

Страница 11: ...ide an effective and safe means of finishing and meet the appropriate performance standards It is essential that the operator of the machine is ad equately trained in its safe operation be authorized...

Страница 12: ...moke when refueling the engine or during any other fuel handling operation Do not refuel the unit with the engine running or while hot If fuel is spilled during refueling wipe it off from the en gine...

Страница 13: ...loses control of it during operation Make sure the Dyna Clutch is disengaged lever in the down position before starting the unit Keep one hand firmly on the handle while starting and do not let go of...

Страница 14: ...obtain long and trouble free use of the unit Periodic maintenance of this unit is essential Read the manual in its entirety and follow the instructions carefully Failure to do so may injure yourself o...

Страница 15: ...ANDLE Can be posi tioned to provide comfort and control for any operator s height Equipped with flanged and cushioned motorcycle style hand grips to absorb vibration and minimize operator fatigue Stan...

Страница 16: ...t of engine speed To use simply move the lever all the way up to the RUN position to engage the trowel blades To stop the blades from turning push the lever all the way down to STOP position In the ev...

Страница 17: ...NKAGE Rod The linkage rod is fastened to a yoke end and a swivel by two nuts To adjust follow the steps listed below 1 Usingthelifteye raisethetrowelusinganoverhead crane 2 The lower end of the linkag...

Страница 18: ...MANUAL included with the unit for specific instructions INITIAL OPERATION With engine started as instructed previously and at operating tem perature adjust speed to about half throttle Hold the handle...

Страница 19: ...gearcase when the unit is at rest on a level sur face Add oil as required to keep oil level at cor rect height Gearcase oil should be changed ev ery 250 hours of operation or once a year which ever co...

Страница 20: ......

Страница 21: ......

Страница 22: ......

Страница 23: ...ORNIA PROPOSITION 65 WARNING Operation of this equipment and or engine exhaust from this product contains chemicals known to the State of California to cause cancer birth defects or other reproductive...

Страница 24: ...Be Stone Construction Equipment Inc P O Box 150 Honeoye New York 14471 Phone 800 888 9926 Fax 585 229 2363 e mail sceny mcimail com www stone equip com A 100 employee owned American manufacturer 1984...

Отзывы:

Похожие инструкции для CF24E