Mounting instructions for seesaw „sali 4“
Item No. 51 2515 402
1. Select the location of the play equipment taking into account the required mini-
mum space (see diagram 3: 2500 x 5600mm).
2. The impact area of a playground equipment with an enforced movement is not
allowed to overlap the impact area of other equipment.
According to DIN EN 1176-1, 4.2.8.5.2 shock-absorbing floors must be made on
the entire impact area of every equipment that cause forced movement.
3. Carry out excavation work for the foundation as shown in diagram 2. After exca-
vation compress the foundation floor.
Note:
The seesaw is installed at play level. Pay attention to items marked „play
level“ at play equipment!
4. Set up the concrete foundations according to diagram 2 with central, horizontal
reinforcement. The tube of the seesaw softeners have to be set in concrete.
5. After a setting period of 10 – 14 days, depending on weather conditions and
foundation size, fill up and compress the holes between the foundation and the
foundation hole with excavation.
Reinforcement plan:
Concrete foundation with reinforcement
Main foundation: BSt 500S
Stirrups Ø 8 mm lengthwise and cross
Concrete cover h´= 3 cm
Concrete quality class C 20/25
Diagram 2: Foundation plan
300
400
3527
495
1300
1300
450
75
1116
300
850
300
300
1500
400
400
OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
1
sali 4
Benennung
Gepr.
Blatt
Datum
Projekt
Gez.
Zeichnungsnummer
1:20
A3
Name
Name
Fundamentplan
0410-00-00
Maßstab
Schramm
20.03.17
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
Beton
concrete
gewachsenes Erdreich
natural ground
Legende
stoßdämpfender Boden
shock-absorbing floor
C stoßdämpfender Boden
13.05.20 ES
B Dämpfer Funda. verschoben 04.12.18 SI
SI
22.06.18
Dämpfer Funda. verschoben
A
Datum
Änderung
Rev
300
400
3527
495
1300
1300
450
75
1116
300
850
300
300
1500
400
400
OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
1
sali 4
Benennung
Gepr.
Blatt
Datum
Projekt
Gez.
Zeichnungsnummer
1:20
A3
Name
Name
Fundamentplan
0410-00-00
Maßstab
Schramm
20.03.17
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
Beton
concrete
gewachsenes Erdreich
natural ground
Legende
stoßdämpfender Boden
shock-absorbing floor
C stoßdämpfender Boden
13.05.20 ES
B Dämpfer Funda. verschoben 04.12.18 SI
SI
22.06.18
Dämpfer Funda. verschoben
A
Datum
Änderung
Rev
Play level
Concrete foundations