© stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid • Tel. +49 (0) 2689 92790-0 • All rights and product modifications reserved.
Mounting instructions for slide „podium“
Item-No. 51 3515 401
State: 17.06.2016 p. 2
1000
400
500
450
2115
1000
900
Beton
Concrete
Erde
Ground
Füllmaterial
Filling
Rev.:
Projekt:
BESTELL-NR:
ZG-NR:
BENENNUNG:
OHNE SCHRIFTLICHE ZUSTIMMUNG DER C KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT
NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VERWENDET
WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
FREIG:
GEPR:
GEZ:
DATUM:
NAME:
WERKSTOFF
MAßSTAB:
OBERFLAECHEN NACH
DIN ISO 1302 REIHE 2
ZUL. ABWEICHUNG
DIN 2768 - mH
+0,3
-0,3
WERKSTUECKKANTEN
NACH DIN 6784
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
A3
05.04.2016
Abmaße:
Fertigung:
Behnke
Gewicht:
Fundamentplan
turris150
Diagram 2: Side view with dimension details „podium“
Play level
Concrete foundations
1. Select the play equipment location in consideration of the required safety area
(see Diagram 3: 7000 x 4100mm).
2. Carry out excavation work for the two foundations as shown in Diagram 2.
After excavation, compress the foundation floor.
Note:
The slide is built in on the play level. Pay attention to items marked
„game level“ of play equipment!
3. Concrete foundation acc. the specified dimensions (LxWxH
1000 x 1000 x 500mm for the main foundation and LxWxH 400 x 900 x 500mm
for the slide exit) with central, horizontal reinforcement
4. After a setting period of 10-14 days, depending on weather conditions an foun
-
dation size, clean the surface of the foundations.
5. Place the slide tower onto the main foundation (as shown in the diagram) and
screw it onto the foundation using the dowels M10 for heavy loads included in
the delivery.
Reinforcement plan:
Concrete foundation with reinforcement
Main foundation: BSt 500S
Ever 4 stirrups Ø 8 mm lengthwise and cross
Concrete cover h´= 3 cm
Concrete quality class C20/25
1000
400
500
450
2115
1000
900
Beton
Concrete
Erde
Ground
Füllmaterial
Filling
Rev.:
Projekt:
BESTELL-NR:
ZG-NR:
BENENNUNG:
OHNE SCHRIFTLICHE ZUSTIMMUNG DER C KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT
NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VERWENDET
WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
FREIG:
GEPR:
GEZ:
DATUM:
NAME:
WERKSTOFF
MAßSTAB:
OBERFLAECHEN NACH
DIN ISO 1302 REIHE 2
ZUL. ABWEICHUNG
DIN 2768 - mH
+0,3
-0,3
WERKSTUECKKANTEN
NACH DIN 6784
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
A3
05.04.2016
Abmaße:
Fertigung:
Behnke
Gewicht:
Fundamentplan
turris150