Mounting instructions for swing „patis 1“
Item-No. 51 2012 402
State: 12.08.2020 p. 2
Play level
1. Select the location of the play equipment taking into account the required
minimum space (see diagram 4, 7800x 1750mm).
2. The impact area of a playground equipment with an enforced movement is
not allowed to overlap the impact area of other equipment.
According to DIN EN 1176-1, 4.2.8.5.2 shock-absorbing floors must be made
on the entire impact area of every equipment that cause forced movement.
3. Carry out excavation work for the foundations as shown in diagram 2. After
excavation compress the foundation floor.
Note:
The swing is installed at play level.
Pay attention to items marked „play level“ at play equipment!
4. Set up the concrete foundations according to diagram 2 with central, horizon-
tal reinforcement.
5. After a setting period of 10-14 days, depending on weather conditions and
foundation size, fill up and compress the holes between the foundation and
the foundation hole with excavation.
6. Screw the swing bar with the screws included in the delivery to the posts and
insert the plastic caps into the swing bar as shown in diagram 3.
Reinforcement plan:
Concrete foundation with rein-
forcement
Main foundation: BSt 500S
Stirrups Ø 8 mm lengthwise and cross
Concrete cover h´=5 cm, e=15 cm
Concrete quality class C 25/30
Diagram 2: Foundation plan
500
900
2900
2002
450
2487
1000
1000
OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
1
Patis 1
Benennung
Gepr.
Blatt
Datum
Projekt
Gez.
Zeichnungsnummer
1:30
A3
Name
Name
Fundamentplan
0505-00-00
Maßstab
Köhn
26.03.18
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
Beton
concrete
gewachsenes Erdreich
natural ground
Legende
stoßdämpfender Boden
shock-absorbing floor
ES
15.05.20
stoßdämpfender Boden
A
Datum
Änderung
Rev