background image

©  stilum GmbH, Gewerbegebiet Larsheck, 56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  All rights and product modifications reserved

Mounting instructions for motor skills bow cludo  

Item-No. 514514401

State: 20.09.2019 p. 2

 

1.  Select the play equipment location in consideration of the play area. 

Note: Take care of a sufficient distance to other playgroung equipments.

2. 

Carry out excavation work for the foundation as shown in diagram 2. After 
excavation compress the foundation floor. 

 

Note: 

The play equipment is built in on the ground level. Pay attention to 

items marked „ground level“ of the play equipment! 

3. 

Set up two concrete foundations acc. to the dimensions indicated in diagram 

2 with central, horizontal reinforcement. 

4. 

After the setting period of 10 - 14 days - depending on weather conditions 
and foundation size - clean the surface of the foundation

5. 

Put the motor skills bow onto the foundations and screw the base plate of the 
equipment with the foundation with the included heavy-duty dowels.

6. 

Fill up the existing gaps between the foundation and foundation hole with 
excavated soil, compact and built an even ground level.

 

Recommended surface material: optional

7. 

Do not allow to use the equipment before the installation has been finished.

 

 
 
 

Reinforcement plan: 

Concrete foundation with rein

-

forcement
Main foundation: BSt 500S 

Ever 4 stirrups Ø 8 mm lengthwise and cross

 

Concrete cover h´= 3 cm
Concrete quality class C20/25

Diagram 2: Foundationplan 

300

500

1300

500

2100

1980

450

1057

1543

2057

500

500

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

Oberflächen nach

DIN ISO 1302

Reihe 2

Zul. Abweichung

DIN 2768 - mH

1

 

cludo

Benennung

Gepr.

Werkstoff

Blatt

Datum

Projekt

Gez.

Zuschnitt

Zeichnungsnummer

Rev

Änderung

Datum

1:20

A3

Gewicht

Name

Name

Fundamentplan

0313-00-00

Maßstab

Schramm

03.08.18

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Beton

Concrete

Füllmaterial

Filling

Erde

Ground

Legende

Отзывы: