State: 03.07.2020 | p. 2
Mounting instructions for waterplay „elix 2“
Item-no. 511511601
© stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid • Tel. +49 (0) 2689 92790-0 • All rights and product modifications reserved.
1. Select the location of the play equipment taking into account the required
minimum space (see diagram 3).
Note:
The play equipment „elix 2“ is to play with water. The customer has to
care for the water supply, the implementing and the maintenance. The water-
play „elix 2“ must not be used in a closed water circulation.
2. Carry out excavation work for the foundations as shown in diagram 2. After
excavation compress the foundation floor.
Note:
The waterplay is installed at play level. Pay attention to items marked
„play level“ of play equipment!
3. Set up the concrete foundations according to diagram 2 with central, horizon-
tal reinforcement.
4. After a setting period of 10 – 14 days, depending on weather conditions and
foundation size, fill up and compress the holes between the foundation and
the foundation hole with excavation.
5.
Clean the foundation surface and place the fixation of the water basin and
the water basin together on the front foundation and screw it onto the founda-
tion with the heavy-duty dowels included in the delivery.
6. Place the play equipment on the rear foundation.
7. Screw the archimedic helix to the frame (see diagram 1). On the other side,
put the archimedic helix onto the connection piece. Make sure that the archi-
medic helix can be rotated easily.
Reinforcement plan:
Concrete foundation with reinforcement
Main foundation: BSt 500S
Stirrups Ø 8 mm lengthwise and cross
Concrete cover h´= 3 cm
Concrete quality class C 20/25
300
900
300
450
500
1484
82
2119
362
A
A
1200
1025
1200
1200
990
A-A
OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
1
elix 2
Benennung
Gepr.
Blatt
Datum
Projekt
Gez.
Zeichnungsnummer
1:20
A3
Name
Name
Fundamentplan
0707-00-00
Maßstab
Simonis
05.06.18
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
Beton
concrete
gewachsenes Erdreich
natural ground
Legende
stoßdämpfender Boden
shock-absorbing floor
B stoßdämpfender Boden
08.06.20 SI
SI
05.08.19
Fundament vergrößert
A
Datum
Änderung
Rev
beliebiger Boden
optional floor
play level
Concrete foundation
Concrete foundation
Diagram 2: Foundation plan