background image

State: 03.07.2020 | p. 2

Mounting instructions for waterplay „elix 2“ 

Item-no. 511511601

©  stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  All rights and product modifications reserved.

1.  Select the location of the play equipment taking into account the required 

minimum space (see diagram 3).  

Note:

 The play equipment „elix 2“ is to play with water. The customer has to 

care for the water supply, the implementing and the maintenance. The water-
play „elix 2“ must not be used in a closed water circulation.

2.  Carry out excavation work for the foundations as shown in diagram 2. After 

excavation compress the foundation floor.

 

Note: 

The waterplay is installed at play level. Pay attention to items marked 

„play level“ of play equipment! 

3.  Set up the concrete foundations according to diagram 2 with central, horizon-

tal reinforcement.

4.  After a setting period of 10 – 14 days, depending on weather conditions and 

foundation size, fill up and compress the holes between the foundation and 

the foundation hole with excavation.

5. 

Clean the foundation surface and place the fixation of the water basin and 

the water basin together on the front foundation and screw it onto the founda-
tion with the heavy-duty dowels included in the delivery.

6.  Place the play equipment on the rear foundation.
7.  Screw the archimedic helix to the frame (see diagram 1). On the other side, 

put the archimedic helix onto the connection piece. Make sure that the archi-
medic helix can be rotated easily.

Reinforcement plan: 

Concrete foundation with reinforcement

Main foundation: BSt 500S 
Stirrups Ø 8 mm lengthwise and cross 
Concrete cover h´= 3 cm
Concrete quality class C 20/25

300

900

300

450

500

1484

82

2119

 362 

A

A

1200

1025

 1200 

 1200 

 990 

A-A

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

1

 

elix 2

Benennung

Gepr.

Blatt

Datum

Projekt

Gez.

Zeichnungsnummer

1:20

A3

Name

Name

Fundamentplan

0707-00-00

Maßstab

Simonis

05.06.18

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Beton

concrete
gewachsenes Erdreich

natural ground

Legende

stoßdämpfender Boden

shock-absorbing floor

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

B stoßdämpfender Boden

08.06.20 SI

SI

05.08.19

Fundament vergrößert

A

Datum

Änderung

Rev

beliebiger Boden

optional floor

play level

Concrete foundation

Concrete foundation

Diagram 2: Foundation plan

Отзывы: