background image

©  stilum GmbH, Gewerbegebiet Larsheck, 56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  All rights and product modifications reserved.

Mounting instructions for merry-go-round „circulus 3“ 

Item No. 51 4013 401

State: 09.03.2017 p. 2

 

·

Diagram 2: Side view with dimension details „circulus3“

Play level

Floor anchor

Concrete foundation

1.  Select the play equipment location in consideration of the required safety 

area (see Diagram 3: Ø 5400 mm). 

2.  The impact area of a playground equipment with an enforced movement is 

not allowed to overlap the impact area of other equipment. 
Regarding to DIN 1176 - 4.2.8.2.5, impact absorbing surfaces have to be put 
under the whole impact area of every equipment with an enforced movement.

3.  Carry out excavation work for the foundation anchor as shown in Diagram 2. 

After excavation, compress the foundation floor.

 

Note: 

The roundabout is built in on the play level. Pay attention to items 

marked „game level“ of play equipment! 

4.  The distance of the playing surface to the bottom of the hub has to be 

60 mm at minimum and a maximum of 110 mm!

5. 

Concrete foundation acc. the specified dimensions (LxWxH 800 x 800 x 

500mm) build with centrally mounted, horizontal reinforcement. It shed the 
supplied anchor bolts with the foundation that the upper angle frame is hori-

zontal and flush with the foundation surface.

Reinforcement plan: 

Concrete foundation with reinforcement

Main foundation: BSt 500S 
Ever 4 stirrups Ø 8 mm lengthwise and cross 
Concrete cover h´= 3 cm
Concrete quality class B25

800

500

max. 

110

Beton

Concrete

Füllmaterial

Filling

Erde 

Ground

Rev.:

Projekt:

BESTELL-NR:

ZG-NR:

BENENNUNG:

OHNE SCHRIFTLICHE ZUSTIMMUNG DER C KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT 

NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VERWENDET 

WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

FREIG:

GEPR:

GEZ:

DATUM:

NAME:

 

WERKSTOFF



MAßSTAB:

OBERFLAECHEN NACH

DIN ISO 1302 REIHE 2

ZUL. ABWEICHUNG

DIN 2768 - mH

+0,3

-0,3

WERKSTUECKKANTEN

NACH DIN 6784

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

A3

 

11.03.2016

Abmaße:

 

Fertigung:

Behnke

1x

Gewicht:

 

Fundamentplan

0057-00-00

circulus3

800

500

max. 

110

Beton

Concrete

Füllmaterial

Filling

Erde 

Ground

Rev.:

Projekt:

BESTELL-NR:

ZG-NR:

BENENNUNG:

OHNE SCHRIFTLICHE ZUSTIMMUNG DER C KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT 

NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VERWENDET 

WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

FREIG:

GEPR:

GEZ:

DATUM:

NAME:

 

WERKSTOFF



MAßSTAB:

OBERFLAECHEN NACH

DIN ISO 1302 REIHE 2

ZUL. ABWEICHUNG

DIN 2768 - mH

+0,3

-0,3

WERKSTUECKKANTEN

NACH DIN 6784

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

A3

 

11.03.2016

Abmaße:

 

Fertigung:

Behnke

1x

Gewicht:

 

Fundamentplan

0057-00-00

circulus3

mind. 60

Содержание circulus 3

Страница 1: ...sheck 56271 Kleinmaischeid Tel 49 0 2689 92790 0 All rights and product modifications reserved Mounting instructions for merry go round circulus 3 Item No 51 4013 401 State 09 03 2017 p 1 Diagram 1 Overall view of the play equipment ...

Страница 2: ... Reinforcement plan Concrete foundation with reinforcement Main foundation BSt 500S Ever 4 stirrups Ø 8 mm lengthwise and cross Concrete cover h 3 cm Concrete quality class B25 800 500 max 110 Beton Concrete Füllmaterial Filling Erde Ground Rev Projekt BESTELL NR ZG NR BENENNUNG OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT NOCH DRITTEN M...

Страница 3: ...ted Set up impact absorbing playground surfacing according to EN 1177 HIC 1000 Critical drop height 660 mm Recommended surface material grass sand wood chip gravel synth fall protection 10 Do not allow children to use the equipment before the installation has been finished Attention If the play equipment has been incompletely installed or partly dis mantled when carrying out maintenance and repair...

Страница 4: ...hed by rainfall should be frequently clea ned from dirt and deposits due to air pollution and dirt caused by the atmosphere Light soiling can easily be romoved by using a high pressure cleaner For persistent deposits use a clean cloth moistened with a special liquid cleaner e g on phosphoric acid and rinse off with clear water after a short application time During cleaning with mild abrasive compo...

Отзывы: