State: 16.06.2021 p. 3
Mounting instructions for „Calisthenics“
Item-No. 55 1520 402
© stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid • Tel. +49 (0) 2689 92790-0 • All rights and product modifications reserved.
8. Screw the dip module at the standing posts with the lugs (see diagram 3a).
9.
Position the freestanding dip module with the both posts according to dia
-
gram 2.
10.
Screw the hanging module to the two posts and fix it to the pull-up module
with the pipe connectors (diagram 3b and 3c).
Make sure that the pipe is inserted into the pipe connector until it stops.
11.
Align the fitness equipment again and screw the base plates to the founda
-
tions using the heavy-duty dowels included in the delivery.
12.
Place the instruction sheet as well onto the foundations and fix it with the
included heavy-duty dowels.
NOTE:
We suggest to align the instruction sheet in such a way that the inst
-
ructions can be read while using the fitness equipment.
13.
Cover the entire movement area with fall protection according to the required
drop height in accordance with EN 16630.
Critical drop height: 1350 mm
Recommended surface material: sand, wood chips, gravel, synth. impact
protection.
Grass is not allowed.
With a smaller installation depth (special edition) we recommend synthetic
impact protection. In this case, make sure that protruding parts (e.g. screws,
gusset plates) are covered with appropriate fall protection.
14. Do not allow to use the equipment before the installation has been finished.
Attention:
If the fitness equipment has been incompletely installed or partly
dismantled when carrying out maintenance and repair work, this may lead to
particular risks of injury for the user. For this reason, make clearly visible that the
equipment shall not be used in such cases.
pipe connector
connection of the lug
Diagram 3a: Connection of the lug
Diagram 3b: Pipe connector
Diagram 3c: Position of the single elements
OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
Oberflächen nach
DIN ISO 1302
Reihe 2
Zul. Abweichung
DIN 2768 - mH
1
calisthenics (150)
Benennung
Gepr.
Werkstoff
Blatt
Datum
Projekt
Gez.
Zuschnitt
Zeichnungsnummer
Rev
Änderung
Datum
1:30
A3
Gewicht
Name
Name
Explosion
2007-00-00
374.7
Maßstab
Schramm
08.05.17
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
Oberflächen nach
DIN ISO 1302
Reihe 2
Zul. Abweichung
DIN 2768 - mH
2
calisthenics (150)
Benennung
Gepr.
Werkstoff
Blatt
Datum
Projekt
Gez.
Zuschnitt
Zeichnungsnummer
Rev
Änderung
Datum
1:30
A3
Gewicht
Name
Name
Übersicht
2007-00-00
374.7
Maßstab
Schramm
08.05.17
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
Oberflächen nach
DIN ISO 1302
Reihe 2
Zul. Abweichung
DIN 2768 - mH
2
calisthenics (150)
Benennung
Gepr.
Werkstoff
Blatt
Datum
Projekt
Gez.
Zuschnitt
Zeichnungsnummer
Rev
Änderung
Datum
1:30
A3
Gewicht
Name
Name
Übersicht
2007-00-00
374.7
Maßstab
Schramm
08.05.17
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland