1.
Select the fitness equipment location in consideration of the required move
-
ment area (see diagram 4).
2.
Select the postition of the instruction sheet.
Attention:
Because of the risk of injury, the instruction sheet has to be arran
-
ged outside of the movement area.
3.
Carry out excavation work for the foundations as shown in diagram 2.
After excavation compress the foundation floor.
Note:
Pay attention to items marked „ground level“ at the equipment!
4. Carry out excavation work for the instruction sheet foundations as shown in
diagram 5. After excavation compress the foundation floor.
5. Set up the concrete foundations according to diagram 2 and 5 with central,
horizontal reinforcement.
6.
After a setting period of 10 – 14 days, depending on weather conditions and
foundation size, fill up and compress the holes between the foundation and
the foundation hole with excavation. Clean the foundation surface.
7.
Screw the four standing posts with the pull-up module at the lugs. Pay atten
-
tion to the exact installation according to diagram 1, 2 and 3c.
Note:
Do not screw the base plates onto the foundations yet!
Diagram 2: Foundation plan
Reinforcement plan:
Concrete foundation with reinforcement
Foundation: BSt 500S
Stirrups Ø 8 mm lengthwise and cross
Concrete cover h´= 3 cm
Concrete quality class C20/25
1387
600
600
600
1340
1825
600
1150
1800
1300
1200
600
600
866
750
1191
2050
750
50
1200
87
200
5237
600
812
106
400
4440
450
2234
1309
2368
2512
OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
1
calisthenics (450)
Benennung
Gepr.
Blatt
Datum
Projekt
Gez.
Zeichnungsnummer
1:40
A3
Name
Name
Fundament
2020-00-00
Maßstab
Behnke
30.08.17
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
Beton
concrete
gewachsenes Erdreich
natural ground