background image

©  stilum GmbH, 56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  Alle Rechte und Produktmodifikationen vorbehalten

State: 11.08.2017 p. 3

Mounting instructions for multiplay equipment „ascendo robinia“

Item-No. 517510601

Foundation plan

Diagram 2b: Top view with dimension details of the foundations

450

850

400

3371

A

A

3652

706

1511

3645

4808

4027

1750

600

600

950

275

2880

1846

2909

1750

400

1100

500

1000

500

979

950

1750

561

2034

2005

A-A

6338

5373

OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE 

TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER 

ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER- 

WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

Oberflächen nach

DIN ISO 1302

Reihe 2

Zul. Abweichung

DIN 2768 - mH

1

 

ascendo 2A

Benennung

Gepr.

Werkstoff

Blatt

Datum

Projekt

Gez.

Zuschnitt

Zeichnungsnummer

Rev

Änderung

Datum

1:50

A3

Gewicht

Name

Name

Fundamentplan

1028-00-00

1202.2

Maßstab

Mattheis

02.05.17

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

Beton

Concrete

Füllmaterial

Filling

Erde

Ground

Legende

4.  After a setting period of 10-14 days, depending on weather condi-

tions and foundation size - clean the surface of the foundations and 
start with the installation of the combination equipment.              

5.  Place the two towers as shown in Diagram 1, 2a and 2b at the 

main foundations and do a rough aligning. Please take care that 
the connections für the wobble bridge (shown in diagram 4) are 
positioned face to face.  

Note: Do not screw the base plates onto the foundations yet!

6.  Hook  in the wobble bridge as shown in diagram 4a and screw it 

with the screws included in the delivery. 

7. 

Place the slide and the climbing slant at the shafts and fix it with 

the screws and the adapter for the pipes which are included in the 
delivery (diagram 4b). 

8. 

Connect the climbing bow and the two fireman‘s posts according to 

diagram 4a at the adapters and screw it. 

9.  Align the whole play equipment once more at the foundation and 

take care that every base plate is positioned in the center of the 
foundation. 

10. Drill holes into all foundations and screw the play equipment into 

the foundations with the included heavy-duty dowels.                                

Содержание Ascendo Robinia

Страница 1: ...ikationen vorbehalten State 11 08 2017 p 1 Mounting instructions for multiplay equipment ascendo robinia Item No 517510601 climbing bow tower wobble bridge slide climbing slant fireman s post climbing wall Diagram 1 Overall view of play equipment with description of individual elements ...

Страница 2: ... LxWxH 1750 x 950 x 400 mm and the smaller foundations 4x LxWxH 600 x 600 x 400mm slide LxWxH 1000 x 500 x 400 mm climbing bow LxWxH 1100 x 500 x 400 mm and the clim bing slant LxWxH 1750 x 400 x 400 mm acc to the dimensions indicated in diagram 2b in the quality class C 20 25 Diagram 2a Rear view with dimension details ascendo robinia Reinforcement plan Concrete foundation with reinforcement Main...

Страница 3: ... as shown in Diagram 1 2a and 2b at the main foundations and do a rough aligning Please take care that the connections für the wobble bridge shown in diagram 4 are positioned face to face Note Do not screw the base plates onto the foundations yet 6 Hook in the wobble bridge as shown in diagram 4a and screw it with the screws included in the delivery 7 Place the slide and the climbing slant at the ...

Страница 4: ...pment which contain components made of stainless steel should not come with normal steel parts in contact Those steel parts may rub off and leave small steel particles in combination with moisture brown rust stains If such corrosion occur on stainless steel parts they are fine to remove with an abrasive 240 grit Please take care when transporting and setting up the fact that the compo nents are ma...

Страница 5: ...FF MAßSTAB OBERFLAECHEN NACH DIN ISO 1302 REIHE 2 ZUL ABWEICHUNG DIN 2768 mH 0 3 0 3 WERKSTUECKKANTEN NACH DIN 6784 Gewerbegebiet Larsheck 56271 Kleinmaischeid Deutschland A3 0201 00 00 29 04 2016 Abmaße Fertigung x x Gewicht 1573590 1 ascendo robinie2 lug connection climbing bow Projekt BESTELL NR ZG NR BENENNUNG FREIG GEPR GEZ DATUM NAME WERKSTOFF MAßSTAB OBERFLAECHEN NACH DIN ISO 1302 REIHE 2 Z...

Страница 6: ...uid cleaner e g on phosphoric acid and rinse off with clear water after a short application time During cleaning with mild abrasive components only wipe over stainless steel surface in polishing direction For heavily soiled surfaces polishes can be used e g for cleaning chrome on cars or for greasy and oily dirt alcoholic cleaning agents and solvents e g ethyl alcohol isopropyl alcohol or acetone ...

Отзывы: