background image

State: 30.06.2021 p.  7

Mounting instructions for multiplay „angulus 5“

Item-No. 51 7525 601

©  stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  All rights and product modifications reserved.

18. Cover the entire impact area with fall protection according to the required 

drop height in accordance with EN 1176-1.  

Critical drop height: 1750 mm. 

Recommended surface material: sand, wood chip, gravel, synth. impact 
protection. 
With a smaller installation depth (special edition) we recommend synthe-
tic impact protection. In this case, make sure that protruding parts (e.g. 
screws, gusset plates) are covered with appropriate fall protection.  

19. Do not allow children to use the equipment before the installation has 

been finished.

 

Attention:

 If the play equipment has been incompletely installed or partly 

dismantled when carrying out maintenance and repair work, this may lead to 
particular risks of injury for the user. For this reason, make clearly visible that 
the equipment shall not be used in such cases. 

STAINLESS STEEL

 

NOTE: 

Play equipment, which contain components made of stainless steel 

should not come with „normal“ steel parts in contact. Those steel parts may 

rub off and leave small steel particles in combination with moisture brown rust 

stains.  

MAINTENANCE: 

If such corrosion occur on stainless steel parts, they are 

fine to remove with an abrasive (240 grit).

Please take care when transporting and setting up the fact that the compo-
nents are made of stainless steel with no „normal“ steel parts in contact.  

In order to preserve a good visual appearance of your stilum playground equip-

ment over a long period one should take care of maintenance of the stainless 

surface even despite of their corrosion resistance.
Especially areas, which can not be reached by rainfall should be frequently 
cleaned from dirt and deposits due to air pollution and dirt caused by the 
atmosphere.

Light soiling can easily be romoved by using a high pressure cleaner.
For persistent deposits use a clean cloth moistened with a special liquid cleaner 

(e.g. on phosphoric acid) and rinse off with clear water after a short application time. 

During cleaning with mild abrasive components, only wipe over stainless steel sur-
face in polishing direction.
For heavily soiled surfaces, polishes can be used (e.g. for cleaning chrome on cars) 
or for greasy and oily dirt alcoholic cleaning agents and solvents (e.g. ethyl alcohol, 
isopropyl alcohol or acetone).
However, it should be noted that the dissolved soiling is not spread over the surface 
again. 
Do not use any chlorid or hydrochloric containing cleaning products nor scouring 
powder, bleaching - or silver polish cleaner. Cleaning intervals depend on type and 
degree of soiling as well as on demands made on optical characteristics. Therefore 
cleaning is advisable at intervals of six to twelve months – whereby in the case of 
strong soiling it is appropriate to clean the playground equipment at intervals of three 
to six months.

WOOD

NOTE:

 For all play equipment with wooden elements, it cannot be ruled out that dry 

cracks may develop. These natural changes of wood are dependent on climate con-
ditions as well as on the age and usage of the play equipment. Longer dry periods 
may lead to more dry cracks. 
This development, however, does not represent a quality defect. Static properties of 
the equipment are not impaired. 
 

See EN 1176 Bbl 1:2019-01 4.2.7.6: Dry cracks in wood elements as a consequence 
of weather conditions are not to be considered as dangerous openings in terms 
of the standard due to the fact that the shape of the cracks (tapering towards the 

inside) makes it almost impossible for fingers to get trapped in them. 

Содержание angulus 5

Страница 1: ...o 51 7525 601 stilum GmbH Gewerbegebiet Larsheck D 56271 Kleinmaischeid Tel 49 0 2689 92790 0 All rights and product modifications reserved climbing balls swing parallel bars slide hexagons climbing eye post climbing net Diagram 1 Overall view of the play equipment post shoe ...

Страница 2: ...ation size fill up and compress the holes between the foundation and the foundation hole with excavation 6 Clean the surface of the foundations and start with the installation of the play equipment 7 Fix the post shoes to the post using the screws included in the delivery do not tighten yet Pay attention to the parallel alignment of the wooden surface and the stainless steel plate see diagram 6e 8...

Страница 3: ... 02 17 Gewerbegebiet Larsheck 56271 Kleinmaischeid Deutschland Beton concrete gewachsenes Erdreich natural ground Legende stoßdämpfender Boden shock absorbing floor C stoßdämpfender Boden 27 08 20 ES B Schaukelfund Höhe geän 27 06 19 SI SI 14 12 18 Schaukelfundament geän A Datum Änderung Rev 6034 400 2925 823 1745 450 OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI KAISER GMBH DARF DIESE TECHNISCHE UNTER...

Страница 4: ...e delivery dia gram 4 12 Align the wooden part on the foundations as shown in diagram 1 and 3 Note Do not screw the base plates onto the foundations yet 13 Set up the swing frame Screw the swing diagram 5a to the swing beam using the supplied bolt and connect it with the upper hexagons at the inten ded location diagram 1 and 3 use the screws included in the delivery Attach chains with swind seat t...

Страница 5: ...e Verbindung 1 3 6 2 83 362 2195 2463 49 6 OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER WENDET WERDEN ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT Oberflächen nach DIN ISO 1302 Reihe 2 Zul Abweichung DIN 2768 mH 1 angulus Benennung Ge...

Страница 6: ...ng balls climbing eye Diagram 6c Attachment part climbing net B 1 10 F G H B 1 10 F B C E C 1 10 E 1 10 F 1 20 G 1 10 OHNE SCHRIFT TECHNISCHE UNTE ZUGÄNGLICH GEMA WENDET WERDEN Oberflächen nach DIN ISO 1302 Reihe 2 Zul Abweichung DIN 2768 mH angulu Benennu Gepr Werkstoff Datum Projekt Gez Zuschnitt Zeichnun Rev Änderung Datum Gewicht Name Name Übers 1022 0 x xx xx xx Gewerbegebiet Larsheck 56271 K...

Страница 7: ...e Especially areas which can not be reached by rainfall should be frequently cleaned from dirt and deposits due to air pollution and dirt caused by the atmosphere Light soiling can easily be romoved by using a high pressure cleaner For persistent deposits use a clean cloth moistened with a special liquid cleaner e g on phosphoric acid and rinse off with clear water after a short application time D...

Страница 8: ...ommended to clean and or glaze at every 6 to 12 months or to shorten the cleaning interval to 3 to 6 months if the wheather conditions are bad LASUR Use a soft and flat brush or and a glaze application roll to paint The wood should be cleaned a few hours before glazing That can be done with mild javel water which should in any case be rubbed off afterwards For resistant dirt use a wood cleaner Eve...

Отзывы: