State: 30.06.2021 p. 4
Mounting instructions for multiplay „angulus 5“
Item-No. 51 7525 601
© stilum GmbH, Gewerbegebiet Larsheck, D-56271 Kleinmaischeid • Tel. +49 (0) 2689 92790-0 • All rights and product modifications reserved.
OHNE SCHRIFTLICHE ZUSTIMMUNG DER KAISER GMBH DARF DIESE
TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT, NOCH DRITTEN MITGETEILT ODER
ZUGÄNGLICH GEMACHT WERDEN, NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VER-
WENDET WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.
Oberflächen nach
DIN ISO 1302
Reihe 2
Zul. Abweichung
DIN 2768 - mH
1
angulus5
Benennung
Gepr.
Werkstoff
Blatt
Datum
Projekt
Gez.
Zuschnitt
Zeichnungsnummer
Rev
Änderung
Datum
1:40
A3
Gewicht
Name
Name
Explosion
1022-00-00
Maßstab
Mattheis
05.04.17
Gewerbegebiet Larsheck
56271 Kleinmaischeid
Deutschland
9. Fix the diagonal posts as shown in diagram 4 on the upper and lower hexa-
gons with the screws included in the delivery.
Note: Safe the wodden equipment against overturning during the whole
construction.
10. Fix the vertical posts with the diagonal posts at the intended holes
(diagram 4).
11. Mount the wodden bridge as a connection between the lower hexagons and
the single hexagon and screw it with the screws included in the delivery (dia-
gram 4).
12. Align the wooden part on the foundations as shown in diagram 1 and 3.
Note: Do not screw the base plates onto the foundations yet!
13. Set up the swing frame. Screw the swing (diagram 5a) to the swing beam
using the supplied bolt and connect it with the upper hexagons at the inten-
ded location (diagram 1 and 3) use the screws included in the delivery. Attach
chains with swind seat to the swing suspension.
14. Connect the climbing balls (diagram 5c), the climbing eye (diagram 5e) as
shown in diagram 6d, and the parallel bars slide (diagram 5d) as shown
in diagram 6a at the intended location with the hexagons as described in
diagram 1 and fix it with the screws, washers and cap nuts included in the
delivery
.
15. Connect the climbing net (diagram 5b) at the intended location and place the
foundation plate on top of the foundation. Please fasten the parts using the
shackles included in the delivery (diagram 6c).
16. Align the play equipment once more on the foundations.
Note
: The climbing net should be placed with tension to avoid droop.
17. Drill holes into all foundations and screw the play equipment to the founda-
tions with the included heavy-duty dowels. Pay attention again to the parallel
alignment of the plate of the post shoe and the wooden surface,
and tighten the screws.
Diagram 4: explosion drawing
upper hexagons
vertikal posts
diagonal posts
lower hexagons
wodden bridge
hexagon
post shoes