background image

©  stilum GmbH, Gewerbegebiet Larsheck, 56271 Kleinmaischeid  •  Tel. +49 (0) 2689 92790-0  •  All rights and product modifications reserved

Mounting instructions for swing „patis2“ robinia 

Item-No. 51 2014 601

State: 14.06.2016 p. 3

 

5.  Scew the swing bar with the screws M16 included in the delivery to the poles 

as shown in diagram 3. 

6.  After a setting period of 10-14 days, depending on weather conditions and 

foundation size, clean the surface of the foundation, put the play equipment 
on the foundation and screw it with the anchor bolts..

7.  Seal the foundation with the safety cover required for the height of fall indica-

ted. Set up impact-absorbing playground surfacing according to EN 1177 HIC 
1000. 

 

Critical drop height: 1400 mm

 

Recommended surface material: sand,wood chips, gravel, synth. fall protec-
tion. 

8.  Screw the chains with the swing seats onto the swing suspension. Readjust 

the screws on the swing bars.

9.  Do not allow children to use the equipment before the installation has been 

finished.  

Attention:

 If the play equipment has been incompletely installed or partly dis-

mantled when carrying out maintenance and repair work, this may lead to par-
ticular risks of injury for the user. For this reason, make clearly visible that the 
equipment shall not be used in such cases. 

Diagram 4: Top view „patis2“ Robinie

3830

7800

Rev.:

Projekt:

BESTELL-NR:

ZG-NR:

BENENNUNG:

OHNE SCHRIFTLICHE ZUSTIMMUNG DER C KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT 

NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTIGER WEISE MISSBRÄEUCHLICH VERWENDET 

WERDEN. ZUWIDERHANDLUNGEN WERDEN URHEBERRECHTLICH VERFOLGT.

FREIG:

GEPR:

GEZ:

DATUM:

NAME:

WERKSTOFF



MAßSTAB:

OBERFLAECHEN NACH

DIN ISO 1302 REIHE 2

ZUL. ABWEICHUNG

DIN 2768 - mH

+0,3

-0,3

WERKSTUECKKANTEN

NACH DIN 6784

Gewerbegebiet Larsheck

56271 Kleinmaischeid

Deutschland

A3

05.04.2016

Abmaße:

Fertigung:

Behnke

1x

Gewicht:

Draufsicht

patis2 Robinie

Содержание 51 2014 601

Страница 1: ... 56271 Kleinmaischeid Tel 49 0 2689 92790 0 All rights and product modifications reserved Mounting instructions for swing patis2 robinia Item No 51 2014 601 State 14 06 2016 p 1 Diagram 1 Overall view of the play equipment Swing bar Post ...

Страница 2: ...St 500S Ever 4 stirrups Ø 8 mm lengthwise and cross Concrete cover h 3 cm Concrete quality class C 20 25 1000 1000 1000 500 1100 1100 450 Beton Concrete Füllmaterial Filling Erde Ground Rev Projekt BESTELL NR ZG NR BENENNUNG OHNE SCHRIFTLICHE ZUSTIMMUNG DER CONRADI KAISER GMBH DARF DIESE TECHNISCHE UNTERLAGE WEDER VERVIELFÄLTIGT NOCH DRITTEN MITGETEILT ODER ZUGÄNGLICH GEMACHT WERDEN NOCH IN SONSTI...

Страница 3: ...pension Readjust the screws on the swing bars 9 Do not allow children to use the equipment before the installation has been finished Attention If the play equipment has been incompletely installed or partly dis mantled when carrying out maintenance and repair work this may lead to par ticular risks of injury for the user For this reason make clearly visible that the equipment shall not be used in ...

Страница 4: ...be frequently clea ned from dirt and deposits due to air pollution and dirt caused by the atmosphere Light soiling can easily be romoved by using a high pressure cleaner For persistent deposits use a clean cloth moistened with a special liquid cleaner e g on phosphoric acid and rinse off with clear water after a short application time During cleaning with mild abrasive components only wipe over st...

Отзывы: