5
Operation
Assembling the articulated steering system (driving over ramps)
– Couple the hinged tiller with the tow tractor.
Connect the hydraulic line to the tow tractor.
NOTE
To release the hydraulic coupling, refer to
the chapter entitled "Hydraulic/pneumatic
coupling".
– The tugger train is ready for use. Additional
E frames can be fitted to the tugger train by
following the same procedure as previously
described. Always install the hinged tiller
and the rigid tiller alternately; refer to the
relevant chapters relating to the position of
the components.
Installing and removing the compen-
sating hinge
The following section describes the procedure
when loading and unloading is performed on
the left-hand side in the drive direction.
Optional (for attaching a second articulated
frame steering rig).
Installing
– Insert the compensating hinge into the rear
towing jaws of the first articulated frame
steering rig and attach the coupling pin.
68
50988012117 [EN]
Содержание Tugger train Autarkic E Frame
Страница 2: ......
Страница 7: ...1 Foreword ...
Страница 14: ...1 Foreword Environmental considerations 8 50988012117 EN ...
Страница 15: ...2 Introduction ...
Страница 20: ...2 Introduction Residual risk 14 50988012117 EN ...
Страница 21: ...3 Safety ...
Страница 28: ...3 Safety Safety regulations for handling consumables 22 50988012117 EN ...
Страница 29: ...4 Overviews ...
Страница 61: ...5 Operation ...
Страница 121: ...6 Servicing ...
Страница 132: ...6 Servicing Consumables 126 50988012117 EN ...
Страница 133: ...7 Technical data ...
Страница 142: ......
Страница 143: ......
Страница 144: ...STILL GmbH Berzeliusstrasse 10 D 22113 Hamburg Ident no 50988012117 EN ...